Step 1: Enable the required security features#

  • Go to the system security configuration.
  • Grant the SMT.ReworkView security feature, so the Rework View is available.
  • Grant the SMT.ReturnFromRework security feature, so the Return to Production wizard can be run.

Step 2: Configure the rework station#

  • Navigate to Resources.
  • Select or create the Resource that will act as the rework station. Its Processing Type must be Process.
  • Set the attribute SMTIsReworkStation to true.

SMTIsReworkStation attribute enabled on a Resource


Step 3: Review the rework configuration entries#

  • Go to Administration > Configuration and open /SMT/MaterialRework/.
  • AllowReturnWithOpenDefects (default false): leave it off to block the return of Materials that still have open defects, or turn it on to allow it.
  • AgingTimeWarning and AgingTimeLimit (in minutes, optional): set them to highlight the Aging cell of Materials that stay too long at the rework Step.

Step 4: Send a Material to rework#

A Material can be sent to rework in two ways:

  • Manually, with the Rework action on the Material, choosing the rework path to follow.
  • Through Defect Actions, with the Send to Rework Defect Action, configured on the Product and triggered when a defect is recorded or a Material is tracked out. See Defect Actions ⧉ for how to configure and trigger it.

To prepare a Material for the return:

  • Send the Material to rework manually, or record a defect (or track out the Material) so that Send to Rework is applied.
  • Process the Material at the rework station until it reaches the Processed state. The Rework View's Track-In and Track-Out actions can be used for this.

Step 5: Open the Rework View#

  • Open the rework station Resource and go to Views > Rework View.

Rework View with the Return to Production action

  • Use the tab filters, the filter panel, the search box, or Group By to find the Materials to return.
  • Select the Materials in the grid, or scan their barcodes. Scanning a Container selects all of its Materials.

Step 6: Launch Return to Production#

  • In the Rework group of the action bar, click Return to Production.

The button is only enabled when every selected Material is in rework, Processed, and was last processed at this Resource.


Step 7: Validation step#

  • Open Options. Apply Validation Rule is on by default with the rule Same Product.
  • Choose the rule you need: Same Product, Same Product Group, or Same Production Order. To return Materials without a grouping rule, turn Apply Validation Rule off.
  • If a Material does not match the rest of the selection, it is flagged with a warning icon and a tooltip explaining why. The wizard won't continue until it is removed.
  • Remove the flagged Materials, or turn the rule off.
  • Select a Material to review its details on the right, then click Next.

Validation step with a flagged Material


Step 8: Destination step, Same Line#

  • Choose Same Line.
  • The original Line and its FlowPath are shown read-only, together with the Information panel.

Destination step with Same Line selected

  • Click Return.

If the Materials don't all return to the same Line, or a return Line can't be found for some of them, the wizard shows an error when you click Return. Go back to Validation and remove those Materials, or choose another destination.


Step 9 (Optional): Destination step, Different Line#

  • Choose Different Line.
  • Select the Target Line. The Materials' original Line is not listed.
  • If the Line has lanes, select the Target Lane.

Destination step with Different Line selected

  • Click Return.

Step 10 (Optional): Destination step, Offline Station#

  • Choose Offline Station.
  • Select the Offline Station (the inspection Resource).
  • Select the Offline Flow the Materials should follow at the station.
  • If the station can perform more than one Step of that flow, select the Offline Step. Otherwise it is chosen automatically.
  • Check the Return Step: the Step of the main flow the Materials go back to after the offline flow. It defaults to their original return Step.

Destination step with Offline Station selected

  • Click Return.

Step 11: Confirm the result#

  • On success, the wizard shows: "N Material(s) set to return to production successfully. New destination: <Resource name>".
  • The Rework View refreshes and the returned Materials are no longer listed.

Expected Result#

  • The selected Materials are moved in bulk to the destination and FlowPath of the chosen return type.
  • Same Line and Different Line: the Materials are added to a matching parent Lot on the destination Line, which is created automatically if none is being produced.
  • Offline Station: the Materials follow the offline flow, then return to the selected Return Step of the main flow.
  • If the wizard fails, no Materials are moved and the error is shown.
  • MoveNext isn't offered in the Rework View; Return to Production is the action that takes the Materials out of rework.

Frequent Configuration Questions#

Why isn't the Rework View available on my Resource?#

Check that:

  • The Resource has Processing Type Process.
  • The Resource has SMTIsReworkStation enabled.
  • The current user has the SMT.ReworkView security feature.

Why is Return to Production disabled?#

Check that:

  • The current user has the SMT.ReturnFromRework security feature.
  • Every selected Material is in rework, in the Processed state, and was last processed at this Resource.

Why can't I proceed past the Validation step?#

Either the selection is empty, or at least one Material is still flagged by the validation rule. Remove the flagged Materials, or turn Apply Validation Rule off if grouping isn't required.

Why does Same Line show an error?#

The selected Materials don't all return to the same Line, or a return Line can't be found for some of them. Remove those Materials in the Validation step, or choose Different Line or Offline Station.

Why does Different Line fail for my Line?#

Check that:

  • The target Resource is a Line.
  • A lane is selected if the Line has lanes.
  • The smart table StepLineFlowContext has an entry for the Line, the Materials' Product, and their return Step.

Why does Offline Station say the station is not valid?#

The selected Resource can't perform any Step of the selected Offline Flow. Choose another flow or another station.

Why isn't MoveNext in the Rework View?#

MoveNext is left out of the Rework View so that Materials are returned through the wizard, which resolves and validates the destination and FlowPath. Use Return to Production.