Scenario 1: Use a BOM with One Durable Product#

Use this scenario to validate a single durable requirement on the Expose Step and the Ultratech Stepper 01 Resource.

  1. Select the Engine Block H08-P9.002 Material on the Expose Step or on the Ultratech Stepper 01 Resource view, and select Track-In.
  2. If no Durable is assigned, the wrong Durable is assigned, or the Durable is attached to the wrong position, the system blocks the operation.

    Screenshot showing the track-in error raised when the required durable is missing or assigned to the wrong position.

  3. Open the Resource details page or the Resource view, and select Manage Durables. For more information about the operation, see How to: Manage Resource Durables.

    Screenshot showing the Resource page with the Manage Durables option.

  4. Attach Mask XX to the correct position defined in the BOM items.

    Screenshot showing the durable assignment to the required position on the resource.

  5. Select the same Material again and select Track-In to confirm that the required Durable is now available.

    Screenshot showing the track-in wizard with the durable information resolved for the material.

  6. Review the installed Durables on the Durables page of the Resource.

    Screenshot showing the resource durables page after the durable was assigned.

  7. After track-in, verify the durable usage on the Material Traceability View and on the Material History Report.

After you validate the single-durable flow, continue to Scenario 2: Use a BOM with Two Durable Products. The next scenario uses the same model but requires two durable products instead of one.

Watch the recorded walkthrough below.