Scenario 1: Use a BOM with One Durable Product#
Use this scenario to validate a single durable requirement on the Expose Step and the Ultratech Stepper 01 Resource.
- Select the
Engine Block H08-P9.002Material on theExposeStep or on theUltratech Stepper 01Resource view, and select Track-In. -
If no Durable is assigned, the wrong Durable is assigned, or the Durable is attached to the wrong position, the system blocks the operation.
-
Open the Resource details page or the Resource view, and select Manage Durables. For more information about the operation, see How to: Manage Resource Durables.
-
Attach
Mask XXto the correct position defined in the BOM items. -
Select the same Material again and select Track-In to confirm that the required Durable is now available.
-
Review the installed Durables on the Durables page of the Resource.
-
After track-in, verify the durable usage on the Material Traceability View and on the Material History Report.
After you validate the single-durable flow, continue to Scenario 2: Use a BOM with Two Durable Products. The next scenario uses the same model but requires two durable products instead of one.
Watch the recorded walkthrough below.