Shift Planning Configuration#

Estimated time to read: 13 minutes

Prepare the model introduced in Shift Planning before starting the scenarios. Follow the configuration steps in dependency order, or use the prepared master data.

Planner Role Features#

An administrator assigned to PlannerRole can complete the entire tutorial. Before configuration, create this Role and provision User accounts for the planner and 16 operating Employees.

During configuration, use PlannerRole as the Owner Role of the Certifications, Shift Plan, and Workgroups. Link the planning User to ControllerPlanner and assign the operating Employees as its subordinates.

A separate planner account is optional. If it has no administrator access, assign it to PlannerRole and grant the features below; use an administrator for configuration.

Task Features
Open Business Data and the Shift Plan BusinessData.NavigationPane, ShiftPlan.Show
Inspect Employees and their Certifications Employee.Show, Certification.Show
Manage Employee assignments ShiftPlan.ManageEmployees
Generate Employee Calendar Days ShiftPlan.GenerateCalendarDays
Manage absences, non-working time, pool placement, temporary assignments, and availability ShiftPlan.ManageCalendarDays
Validate staffing ShiftPlan.Validate
Inspect, edit, and restore the Calendar Day in the closure exercise Calendar.Show, CalendarDay.Update
View the configured calendar-day types Administration.Tables

Table: PlannerRole features for the planning exercises

Useful Documentation

For the illustrated procedures in this section, see:

Configuration#

Follow the steps in dependency order to prepare the model for the exercises.

Organization and Calendar#

Create the following objects from the Business Data menu, completing each row before continuing.

Step Action Value Helpful Documentation
1 Create a Calendar. ProductionCalendar. Do not add Shifts to the Calendar yet. How to: Create a Calendar
2 Create a Facility. PortoFactory must use ProductionCalendar. How to: Create a Facility
3 Create an Area. ControllerProduction, which belongs to PortoFactory. How to: Create an Area
4 Create the Resources. ControllerAssemblyBench01, ControllerAssemblyBench02, and ControllerFunctionalTester01, in the ControllerProduction Area. How to: Create a Resource
5 Create the Steps. AssembleController and TestController, associated with the ControllerProduction Area. How to: Create a Step
6 Create a Flow. ControllerFlow, with Flow type Sequential. Add AssembleController followed by TestController Steps. How to: Create a Flow

Table: Organization and Calendar foundation

Teams and Shifts#

Before starting, confirm that ProductionCalendar exists, with the operational day starting at midnight on the current day.

  1. In Business Data > Team, create the following Teams, selecting ProductionCalendar for each one. Select Create after entering the name, Calendar, and code for each Team.

    Team Calendar Code
    TeamA ProductionCalendar A
    TeamB ProductionCalendar B
    TeamC ProductionCalendar C
    TeamD ProductionCalendar D

    Table: Teams and codes

    Team A

    Team B

    Team C

    Team D

  2. In Business Data > Shift Definition, create ControllerDayShift using ProductionCalendar. Add the three eight-hour Shifts below, keep Cost Overtime Factor at 1, and leave Non-working times empty. You may customize the shift colors according to your preference.

    Shift Start Time End Time Code Team Pattern
    Shift 1 00:00 08:00 1 AADDCCBB
    Shift 2 08:00 16:00 2 BBAADDCC
    Shift 3 16:00 00:00 3 CCBBAADD

    Table: Shifts and TeamPattern values

    Each character identifies the Team for the corresponding day of the eight-day rotation. Reading the three patterns at the same position gives the Teams assigned to Shifts 1, 2, and 3 for that day; the remaining Team is off.

    For example, position 3 gives D / A / B, with Team C off. All three patterns have eight codes, and all referenced Teams belong to the same Calendar as the Shift Definition.

    Shift Plan Details

    Shift Plan Shifts

  3. Open ProductionCalendar > Week Definition > Manage, apply the ControllerDayShift to Monday through Sunday, and select Save.

    All seven weekdays use the complete Shift Definition. Team days off come from the rotation, rather than non-working weekdays in the Calendar.

    Calendar Week Definition

Useful Documentation

For the illustrated procedures in this section, see:

Generate Calendar Days#

Select a date interval for the exercise, allowing at least 16 consecutive days to inspect two complete eight-day cycles.

  1. Open ProductionCalendar > Calendar Days, select the date interval, and select Generate.
  2. Complete the wizard with the following values, and select Generate.

    Setting Value
    Start Date The first date of the selected interval.
    End Date The last date of the selected interval.
    Number of days Confirm the displayed count matches the selected interval.
    Start Position 1, corresponding to the first character of each Team Pattern.
    Existing Calendar Days handling Generate only missing days; do not override existing days.
    Fiscal information Review the automatically calculated values against the fiscal settings of the Calendar.

    Table: Calendar Day generation settings

    Check the cycle boundary: day 8 has Teams B / C / D on Shifts 1 / 2 / 3 and Team A off; day 9 restarts with Teams A / B / C and Team D off. The same eight-day pattern repeats for longer intervals. Every date must have three staffed shifts, with no Team assigned to more than one shift that day.

    Useful Documentation

    For the illustrated procedures in this section, see:

    Calendar Day - Last Cycle Day

Employees and Certifications#

Create the planner and the 16 operating Employee records using the provisioned User accounts, then assign and grant the Certifications needed for their work. Use the actual account identifiers for the environment.

  1. In Business Data > Employee, create ControllerPlanner first, then the operating Employees in the matrix below. Select the provisioned User for each Employee and apply these shared values:

    Setting Value
    Area ControllerProduction.
    Calendar ProductionCalendar.
    Employee Number A unique identification number.
    Type and Cost Center The values approved for the environment.
    Require Clock-In false for this calendar exercise.

    Table: Shared Employee settings

    Shift Planner Employee

    B1 Employee

  2. Open ControllerPlanner > Subordinates > Assign. Select all 16 operating Employees and select Assign. Verify that they are Active and that ControllerPlanner is their manager.

  3. In Business Data > Certification, create ControllerAssemblyOperator and ControllerTestTechnician, applying the same settings to both:

    Setting Value
    Type The Certification Type approved for the environment.
    Owner Role PlannerRole.
    Allow Manual Grants true.
    Allow Self-Granting false.
    Allow Granting By Manager false; this exercise uses owner-role authority.
    Validity period Unset.
    Enable Trainees false.

    Table: Certification creation settings

    Assembly Certification

    Test Certification

  4. Confirm that both Certifications are Active. On each Certification, open Employees > Assign and select the Employees in its column below. Leave Granted unset and select Assign. Verify the resulting Assigned state before granting.

    Team grouping Assign ControllerAssemblyOperator to Assign ControllerTestTechnician to
    TeamA A1, A2, A3 A3, A4
    TeamB B1, B2, B3 B3, B4
    TeamC C1, C2, C3 C3, C4
    TeamD D1, D2, D3 D3, D4

    Table: Employee Certification assignment matrix

    The Team column identifies the intended planning groups; this step assigns Certifications, not Team or Workgroup positions. The planner manages these Employees but does not receive the operating Certifications in this exercise.

  5. In the Employees section of each Certification, select the assigned records and Grant. Verify that every association is Active. Assignment alone does not establish qualification; the grant gives the Employee the Certification.

    Assembly Certification Employees

    Test Certification Employees

Useful Documentation

For the illustrated procedures in this section, see:

Resource Personnel Requirements#

Complete this optional step to calculate Workgroup Personnel Requirements from Resource Personnel Requirements.

Open the Personnel section of each Resource and select Manage. Under Personnel Requirements, add the following Certification requirement to each Resource:

Resource Certification Quantity Allocation Allocation Type Exclusive
ControllerAssemblyBench01 ControllerAssemblyOperator 1 1 SetupAndProcess false
ControllerAssemblyBench02 ControllerAssemblyOperator 1 1 SetupAndProcess false
ControllerFunctionalTester01 ControllerTestTechnician 1 1 SetupAndProcess false

Table: Resource Personnel Requirements

Quantity 1 requires one qualified Employee; Allocation 1 means full allocation. Select Update on each Resource to save the settings and requirement.

Assembly Bench 01

Assembly Bench 02

Tester

Useful Documentation

For the illustrated procedures in this section, see:

Shift Plan and Workgroups#

  1. In Business Data > Shift Plan, select New and complete the following settings:

    Setting Value
    Name ControllerProductionShiftPlan.
    Calendar ProductionCalendar.
    Owner Role PlannerRole.
    Rules Leave empty for this exercise.

    Table: Shift Plan settings

  2. Continue to Workgroups. Add ControllerAssembly and ControllerFinalTest, setting Owner Role to PlannerRole for both.

  3. In Workgroup Settings, add the following Resource and Step/Facility associations:

    Workgroup Resources Step Facility
    ControllerAssembly ControllerAssemblyBench01, ControllerAssemblyBench02 AssembleController PortoFactory
    ControllerFinalTest ControllerFunctionalTester01 TestController PortoFactory

    Table: Workgroup production associations

    Add each Resource only once within the Shift Plan. Each Step/Facility pair is valid because its Step belongs to Area ControllerProduction, which belongs to PortoFactory; keep each pair unique within its Workgroup.

    This tutorial does not cover the use of rules in Shift Plan requirements. Any rules added when configuring the Shift Plan must use the Shift Planning scope to validate working time requirements.

    Note

    Configure the workgroup within the Shift Plan entity. Do not configure the Workgroup entity itself for this step.

  4. For each Workgroup, enter the following Personnel Requirements explicitly:

    Workgroup Position (Certification) Quantity
    ControllerAssembly ControllerAssemblyOperator 2
    ControllerFinalTest ControllerTestTechnician 1

    Table: Workgroup Personnel Requirements

    Resource requirements describe individual equipment; Workgroup requirements define staffing for the group. They are configured separately.

    Note

    If you completed the preceding Resource Personnel Requirements step, select Calculate Personnel Requirements for each Workgroup instead of entering the requirements manually. Confirm that the calculated quantities match the table above.

  5. Select Create and reopen ControllerProductionShiftPlan to check the saved configuration.

    Shift Plan Details

    Shift Plan Assembly Workgroup

    Shift Plan Test Workgroup

Useful Documentation

For the illustrated procedures in this section, see:

Shift Plan Calendar Days#

Before starting, confirm that the Shift Plan and all operating Employees are Active, their required Certifications are Active, and the selected interval already has Calendar Days. Continue as the User linked to ControllerPlanner. If you prepared the model with a separate administrator account, switch to that planner User now.

  1. Open ControllerProductionShiftPlan and select Manage Employee Teams and Workgroups.

    Employees within each Team Workgroup Position
    Employees 1, 2, and 3 ControllerAssembly ControllerAssemblyOperator
    Employee 4 ControllerFinalTest ControllerTestTechnician

    Table: Normal assignments for every Team

    Set the Team of each Employee to the corresponding TeamA, TeamB, TeamC, or TeamD from the matrix. Set Workgroup and Position together, using a Certification the Employee currently holds. Keep each designated replacement in Assembly for the baseline.

  2. Inspect Summary for all four Teams. Each must have three Assembly Operators against a requirement of two, and one Test Technician against a requirement of one. Select Save and Close.

    Shift Plan Employees

  3. Select Generate Shift Plan Calendar Days and use these settings:

    Setting Value
    Start Date and End Date The same interval used for Calendar Day generation.
    Override employee non-working days Disabled.
    Override employee non-working times Disabled.
    Override employee temporary assignments Disabled.

    Table: Employee Calendar Day generation settings

    Select Generate.

    Earlier Calendar Day generation defined the dated shifts and Team rotation; this separate operation creates individual Employee Calendar Days from those records and the saved Team, Workgroup, and Position assignments.

  4. Open the Calendar view of the Shift Plan and select both Workgroups in the filters. Select the third date of the generated interval as the exercise date, counting the start of the interval as day 1. With Start Position set to 1 during Calendar Day generation, verify the Employee Calendar Days against the following table:

    Shift / status Team Employees Expected coverage
    Shift 1: midnight-8:00 AM TeamD D1-D4 Three Assembly Operators and one Test Technician.
    Shift 2: 8:00 AM-4:00 PM TeamA A1-A4 Three Assembly Operators and one Test Technician; use this Team and shift for the exercises.
    Shift 3: 4:00 PM-midnight TeamB B1-B4 Three Assembly Operators and one Test Technician.
    Off-duty for the operational day TeamC C1-C4 Employee Calendar Days exist, but the Employees are not scheduled to work.

    Table: Exercise-date verification

    Confirm that all 16 Employees have records and that no absence, pool, availability, or temporary-assignment exceptions affect the exercise baseline. Each operating shift deliberately has one more Assembly Operator than required.

    Shift Calendar Days

Useful Documentation

For the illustrated procedures in this section, see:

Non-Working Calendar Day and Time Type#

As the administrator, prepare the following non-working day and time types before starting the scenarios. These custom entries are separate from the nine system calendar-day types. If you use a separate planner account, return to it for the scenarios.

  1. Open Administration > Tables > Lookup Tables and select EmployeeCalendarNonWorkingTimeType.
  2. Open the Data tab and check whether Absence-Hours already exists. If it does not, select Add and enter the following values. Preserve the existing system entries.

    Field Value
    Name Absence-Hours
    Description Absence-Hours
    Enabled Yes

    Table: Non-working time lookup entry

  3. Open Administration > Tables > Lookup Tables and select CalendarDayType.

  4. Open the Data tab and check whether Absence already exists. If it does not, select Add and enter the following values. Preserve the existing system entries.

    Field Value
    Name Absence
    Description Absence
    Enabled Yes

    Table: Non-working day lookup entry

  5. Open Administration > Tables > Generic Tables and select CalendarDayType.

  6. Open the Data tab and check whether Absence already exists. If it does not, select Add and enter the following values. Preserve the existing system entries.

    Field Value
    Type Absence
    IsWorkingDay false
    Code A
    BackgroundColor Choose a color for this absence type.
    ForegroundColor Choose a text color that contrasts with the background.
    IsSystem false

    Table: Custom non-working calendar-day type

  7. Select Save. If the entry already existed, verify its non-working and non-system settings instead of adding a duplicate.

Useful Documentation

Master Data#

The tutorial master data was prepared and tested in Critical Manufacturing MES 12.0 and provides the configured model described in this tutorial.

If you use the master data instead of completing the configuration steps, select a date interval and run Generate Calendar Days on ProductionCalendar. Then run Generate Shift Plan Calendar Days for the same interval.

This is the Master Data file used to create this model.

Next Steps#

With the model configured, continue with these scenarios in order:

  1. Calendar Day Types - inspect the calendar day types.
  2. Cover Employee Absence - cover an absence with a qualified temporary assignment and verify staffing.