Shift Planning Configuration#
Estimated time to read: 13 minutes
Prepare the model introduced in Shift Planning before starting the scenarios. Follow the configuration steps in dependency order, or use the prepared master data.
Planner Role Features#
An administrator assigned to PlannerRole can complete the entire tutorial. Before configuration, create this Role and provision User accounts for the planner and 16 operating Employees.
During configuration, use PlannerRole as the Owner Role of the Certifications, Shift Plan, and Workgroups. Link the planning User to ControllerPlanner and assign the operating Employees as its subordinates.
A separate planner account is optional. If it has no administrator access, assign it to PlannerRole and grant the features below; use an administrator for configuration.
| Task | Features |
|---|---|
| Open Business Data and the Shift Plan | BusinessData.NavigationPane, ShiftPlan.Show |
| Inspect Employees and their Certifications | Employee.Show, Certification.Show |
| Manage Employee assignments | ShiftPlan.ManageEmployees |
| Generate Employee Calendar Days | ShiftPlan.GenerateCalendarDays |
| Manage absences, non-working time, pool placement, temporary assignments, and availability | ShiftPlan.ManageCalendarDays |
| Validate staffing | ShiftPlan.Validate |
| Inspect, edit, and restore the Calendar Day in the closure exercise | Calendar.Show, CalendarDay.Update |
| View the configured calendar-day types | Administration.Tables |
Table: PlannerRole features for the planning exercises
Useful Documentation
For the illustrated procedures in this section, see:
Configuration#
Follow the steps in dependency order to prepare the model for the exercises.
Organization and Calendar#
Create the following objects from the Business Data menu, completing each row before continuing.
| Step | Action | Value | Helpful Documentation |
|---|---|---|---|
| 1 | Create a Calendar. | ProductionCalendar. Do not add Shifts to the Calendar yet. | How to: Create a Calendar |
| 2 | Create a Facility. | PortoFactory must use ProductionCalendar. | How to: Create a Facility |
| 3 | Create an Area. | ControllerProduction, which belongs to PortoFactory. | How to: Create an Area |
| 4 | Create the Resources. | ControllerAssemblyBench01, ControllerAssemblyBench02, and ControllerFunctionalTester01, in the ControllerProduction Area. | How to: Create a Resource |
| 5 | Create the Steps. | AssembleController and TestController, associated with the ControllerProduction Area. | How to: Create a Step |
| 6 | Create a Flow. | ControllerFlow, with Flow type Sequential. Add AssembleController followed by TestController Steps. | How to: Create a Flow |
Table: Organization and Calendar foundation
Teams and Shifts#
Before starting, confirm that ProductionCalendar exists, with the operational day starting at midnight on the current day.
-
In Business Data > Team, create the following Teams, selecting
ProductionCalendarfor each one. Select Create after entering the name, Calendar, and code for each Team.Team Calendar Code TeamAProductionCalendarATeamBProductionCalendarBTeamCProductionCalendarCTeamDProductionCalendarDTable: Teams and codes
-
In Business Data > Shift Definition, create
ControllerDayShiftusingProductionCalendar. Add the three eight-hour Shifts below, keep Cost Overtime Factor at1, and leave Non-working times empty. You may customize the shift colors according to your preference.Shift Start Time End Time Code Team Pattern Shift 1 00:00 08:00 1 AADDCCBB Shift 2 08:00 16:00 2 BBAADDCC Shift 3 16:00 00:00 3 CCBBAADD Table: Shifts and TeamPattern values
Each character identifies the Team for the corresponding day of the eight-day rotation. Reading the three patterns at the same position gives the Teams assigned to Shifts 1, 2, and 3 for that day; the remaining Team is off.
For example, position 3 gives D / A / B, with Team C off. All three patterns have eight codes, and all referenced Teams belong to the same Calendar as the Shift Definition.
-
Open
ProductionCalendar> Week Definition > Manage, apply theControllerDayShiftto Monday through Sunday, and select Save.All seven weekdays use the complete Shift Definition. Team days off come from the rotation, rather than non-working weekdays in the Calendar.
Useful Documentation
For the illustrated procedures in this section, see:
Generate Calendar Days#
Select a date interval for the exercise, allowing at least 16 consecutive days to inspect two complete eight-day cycles.
- Open
ProductionCalendar> Calendar Days, select the date interval, and select Generate. -
Complete the wizard with the following values, and select Generate.
Setting Value Start Date The first date of the selected interval. End Date The last date of the selected interval. Number of days Confirm the displayed count matches the selected interval. Start Position 1, corresponding to the first character of each Team Pattern.Existing Calendar Days handling Generate only missing days; do not override existing days. Fiscal information Review the automatically calculated values against the fiscal settings of the Calendar. Table: Calendar Day generation settings
Check the cycle boundary: day 8 has Teams B / C / D on Shifts 1 / 2 / 3 and Team A off; day 9 restarts with Teams A / B / C and Team D off. The same eight-day pattern repeats for longer intervals. Every date must have three staffed shifts, with no Team assigned to more than one shift that day.
Useful Documentation
For the illustrated procedures in this section, see:
Employees and Certifications#
Create the planner and the 16 operating Employee records using the provisioned User accounts, then assign and grant the Certifications needed for their work. Use the actual account identifiers for the environment.
-
In Business Data > Employee, create
ControllerPlannerfirst, then the operating Employees in the matrix below. Select the provisioned User for each Employee and apply these shared values:Setting Value Area ControllerProduction.Calendar ProductionCalendar.Employee Number A unique identification number. Type and Cost Center The values approved for the environment. Require Clock-In falsefor this calendar exercise.Table: Shared Employee settings
-
Open
ControllerPlanner> Subordinates > Assign. Select all 16 operating Employees and select Assign. Verify that they are Active and thatControllerPlanneris their manager. -
In Business Data > Certification, create
ControllerAssemblyOperatorandControllerTestTechnician, applying the same settings to both:Setting Value Type The Certification Type approved for the environment. Owner Role PlannerRole.Allow Manual Grants true.Allow Self-Granting false.Allow Granting By Manager false; this exercise uses owner-role authority.Validity period Unset. Enable Trainees false.Table: Certification creation settings
-
Confirm that both Certifications are Active. On each Certification, open Employees > Assign and select the Employees in its column below. Leave Granted unset and select Assign. Verify the resulting Assigned state before granting.
Team grouping Assign ControllerAssemblyOperator to Assign ControllerTestTechnician to TeamAA1,A2,A3A3,A4TeamBB1,B2,B3B3,B4TeamCC1,C2,C3C3,C4TeamDD1,D2,D3D3,D4Table: Employee Certification assignment matrix
The Team column identifies the intended planning groups; this step assigns Certifications, not Team or Workgroup positions. The planner manages these Employees but does not receive the operating Certifications in this exercise.
-
In the Employees section of each Certification, select the assigned records and Grant. Verify that every association is Active. Assignment alone does not establish qualification; the grant gives the Employee the Certification.
Useful Documentation
For the illustrated procedures in this section, see:
Resource Personnel Requirements#
Complete this optional step to calculate Workgroup Personnel Requirements from Resource Personnel Requirements.
Open the Personnel section of each Resource and select Manage. Under Personnel Requirements, add the following Certification requirement to each Resource:
| Resource | Certification | Quantity | Allocation | Allocation Type | Exclusive |
|---|---|---|---|---|---|
ControllerAssemblyBench01 | ControllerAssemblyOperator | 1 | 1 | SetupAndProcess | false |
ControllerAssemblyBench02 | ControllerAssemblyOperator | 1 | 1 | SetupAndProcess | false |
ControllerFunctionalTester01 | ControllerTestTechnician | 1 | 1 | SetupAndProcess | false |
Table: Resource Personnel Requirements
Quantity 1 requires one qualified Employee; Allocation 1 means full allocation. Select Update on each Resource to save the settings and requirement.
Useful Documentation
For the illustrated procedures in this section, see:
Shift Plan and Workgroups#
-
In Business Data > Shift Plan, select New and complete the following settings:
Setting Value Name ControllerProductionShiftPlan.Calendar ProductionCalendar.Owner Role PlannerRole.Rules Leave empty for this exercise. Table: Shift Plan settings
-
Continue to Workgroups. Add
ControllerAssemblyandControllerFinalTest, setting Owner Role toPlannerRolefor both. -
In Workgroup Settings, add the following Resource and Step/Facility associations:
Workgroup Resources Step Facility ControllerAssemblyControllerAssemblyBench01,ControllerAssemblyBench02AssembleControllerPortoFactoryControllerFinalTestControllerFunctionalTester01TestControllerPortoFactoryTable: Workgroup production associations
Add each Resource only once within the Shift Plan. Each Step/Facility pair is valid because its Step belongs to Area
ControllerProduction, which belongs toPortoFactory; keep each pair unique within its Workgroup.This tutorial does not cover the use of rules in Shift Plan requirements. Any rules added when configuring the Shift Plan must use the Shift Planning scope to validate working time requirements.
Note
Configure the workgroup within the Shift Plan entity. Do not configure the Workgroup entity itself for this step.
-
For each Workgroup, enter the following Personnel Requirements explicitly:
Workgroup Position (Certification) Quantity ControllerAssemblyControllerAssemblyOperator2ControllerFinalTestControllerTestTechnician1Table: Workgroup Personnel Requirements
Resource requirements describe individual equipment; Workgroup requirements define staffing for the group. They are configured separately.
Note
If you completed the preceding Resource Personnel Requirements step, select Calculate Personnel Requirements for each Workgroup instead of entering the requirements manually. Confirm that the calculated quantities match the table above.
-
Select Create and reopen
ControllerProductionShiftPlanto check the saved configuration.
Shift Plan Calendar Days#
Before starting, confirm that the Shift Plan and all operating Employees are Active, their required Certifications are Active, and the selected interval already has Calendar Days. Continue as the User linked to ControllerPlanner. If you prepared the model with a separate administrator account, switch to that planner User now.
-
Open
ControllerProductionShiftPlanand select Manage Employee Teams and Workgroups.Employees within each Team Workgroup Position Employees 1, 2, and 3 ControllerAssemblyControllerAssemblyOperatorEmployee 4 ControllerFinalTestControllerTestTechnicianTable: Normal assignments for every Team
Set the Team of each Employee to the corresponding
TeamA,TeamB,TeamC, orTeamDfrom the matrix. Set Workgroup and Position together, using a Certification the Employee currently holds. Keep each designated replacement in Assembly for the baseline. -
Inspect Summary for all four Teams. Each must have three Assembly Operators against a requirement of two, and one Test Technician against a requirement of one. Select Save and Close.
-
Select Generate Shift Plan Calendar Days and use these settings:
Setting Value Start Date and End Date The same interval used for Calendar Day generation. Override employee non-working days Disabled. Override employee non-working times Disabled. Override employee temporary assignments Disabled. Table: Employee Calendar Day generation settings
Select Generate.
Earlier Calendar Day generation defined the dated shifts and Team rotation; this separate operation creates individual Employee Calendar Days from those records and the saved Team, Workgroup, and Position assignments.
-
Open the Calendar view of the Shift Plan and select both Workgroups in the filters. Select the third date of the generated interval as the exercise date, counting the start of the interval as day 1. With Start Position set to
1during Calendar Day generation, verify the Employee Calendar Days against the following table:Shift / status Team Employees Expected coverage Shift 1: midnight-8:00 AM TeamDD1-D4Three Assembly Operators and one Test Technician. Shift 2: 8:00 AM-4:00 PM TeamAA1-A4Three Assembly Operators and one Test Technician; use this Team and shift for the exercises. Shift 3: 4:00 PM-midnight TeamBB1-B4Three Assembly Operators and one Test Technician. Off-duty for the operational day TeamCC1-C4Employee Calendar Days exist, but the Employees are not scheduled to work. Table: Exercise-date verification
Confirm that all 16 Employees have records and that no absence, pool, availability, or temporary-assignment exceptions affect the exercise baseline. Each operating shift deliberately has one more Assembly Operator than required.
Useful Documentation
For the illustrated procedures in this section, see:
Non-Working Calendar Day and Time Type#
As the administrator, prepare the following non-working day and time types before starting the scenarios. These custom entries are separate from the nine system calendar-day types. If you use a separate planner account, return to it for the scenarios.
- Open Administration > Tables > Lookup Tables and select
EmployeeCalendarNonWorkingTimeType. -
Open the Data tab and check whether
Absence-Hoursalready exists. If it does not, select Add and enter the following values. Preserve the existing system entries.Field Value Name Absence-HoursDescription Absence-HoursEnabled YesTable: Non-working time lookup entry
-
Open Administration > Tables > Lookup Tables and select
CalendarDayType. -
Open the Data tab and check whether
Absencealready exists. If it does not, select Add and enter the following values. Preserve the existing system entries.Field Value Name AbsenceDescription AbsenceEnabled YesTable: Non-working day lookup entry
-
Open Administration > Tables > Generic Tables and select
CalendarDayType. -
Open the Data tab and check whether
Absencealready exists. If it does not, select Add and enter the following values. Preserve the existing system entries.Field Value Type AbsenceIsWorkingDay falseCode ABackgroundColor Choose a color for this absence type. ForegroundColor Choose a text color that contrasts with the background. IsSystem falseTable: Custom non-working calendar-day type
-
Select Save. If the entry already existed, verify its non-working and non-system settings instead of adding a duplicate.
Useful Documentation
Master Data#
The tutorial master data was prepared and tested in Critical Manufacturing MES 12.0 and provides the configured model described in this tutorial.
If you use the master data instead of completing the configuration steps, select a date interval and run Generate Calendar Days on ProductionCalendar. Then run Generate Shift Plan Calendar Days for the same interval.
This is the Master Data file used to create this model.
Next Steps#
With the model configured, continue with these scenarios in order:
- Calendar Day Types - inspect the calendar day types.
- Cover Employee Absence - cover an absence with a qualified temporary assignment and verify staffing.