Cover Employee Absence#

Estimated time to read: 7 minutes

Overview#

An employee absence can leave a shift short of qualified personnel. Shift Planning lets you temporarily reassign a qualified colleague to cover the gap.

This page contains two scenarios:

  • Coverage within a Team/Shift - cover an absence by moving a cross-certified employee.
  • Coverage from another Team - handle two absences in a Team, offer a replacement from another Team through the pool, and record the availability of an off-duty Employee as backup. Verify coverage in both Teams.

Before You Start#

Complete Shift Planning Configuration and restore the starting assignments after Calendar Day Types.

Item Required state
Access Sign in as the manager of the operating Employees, with the access listed in Shift Planning Configuration.
Exercise date Third date of the generated interval, counting its start as day 1. Calendar Day generation used Start Position 1; Employee Calendar Days exist for the same date.
Shift and Team TeamA works Shift 2, TeamD works Shift 1, TeamB works Shift 3, and TeamC is off-duty.
Starting assignments A1, A2, and A3: ControllerAssemblyOperator. A4: ControllerTestTechnician. All belong to TeamA.
Qualifications A3 holds both ControllerAssemblyOperator and ControllerTestTechnician Certifications.
Absence type Absence exists in Generic Table CalendarDayType, with IsWorkingDay and IsSystem set to false.
Exceptions A1-A4 have no absence, non-working-time, pool, availability, or temporary-assignment exceptions on the exercise date. No other Employee temporarily covers Final Test on Shift 2.

Table: Absence-coverage starting conditions

Open ControllerProductionShiftPlan > Calendar, display the exercise date, and select ControllerAssembly and ControllerFinalTest in the Workgroup filters. Clear any previous validation results. Keep permanent Employee assignments unchanged throughout the exercise.

Coverage within a Team#

Record Absence#

  1. Confirm the starting Shift 2 counts: three Assembly Operators (A1, A2, A3) and one Test Technician (A4).
  2. Select only A4 on the exercise date. Select Set Non-Working Days, choose Absence as Non-Working Day Type, and select Set.
  3. Keep the Employee Calendar Day for A4 selected and select Validate.
  4. Inspect the warning and error indicators above the exercise date and hover over them to read the Shift 2 messages. Confirm both results:

    Workgroup Required Available Expected result
    ControllerAssembly 2 Assembly Operators 3: A1, A2, A3 Surplus warning (W).
    ControllerFinalTest 1 Test Technician 0 Shortage error (E).

    Table: Shift 2 coverage with A4 absent

    Employee A4 Absent

Useful Documentation

For the illustrated procedures in this section, see:

Temporarily Assign Employee#

  1. Select only A3 on the exercise date. Confirm the Calendar Day is working, A3 has no non-working-day exception, and Is Temporarily Assigned is false. Verify the Active ControllerTestTechnician Certification.
  2. Select Assign Temporarily and enter the following values:

    Field Value
    Workgroup ControllerFinalTest
    Team TeamA
    Position ControllerTestTechnician

    Table: Temporary destination for A3

  3. Select Assign. Confirm Is Temporarily Assigned is true and the saved destination matches the table. Keep the absence of A4 recorded.

  4. Select the Employee Calendar Day for A4, which still has Non-Working Day Type set to Absence, and select Validate again.

  5. Confirm the previous Shift 2 Assembly surplus warning and Final Test shortage error are no longer reported. A4 remains absent; A3 supplies the required Final Test coverage. Teams D and B retain their original assignments and Assembly surplus on Shifts 1 and 3.

    Employee A3 Temporarily Assigned

Useful Documentation

For the illustrated procedures in this section, see:

Coverage from Another Team#

Team A cannot always cover a shortage internally. In this exercise, A2 and Test Technician A4 are absent, so A1 and A3 must remain in Assembly. The planner needs a qualified replacement from another Team.

Team D will offer working D3 through the pool as the intended replacement for Team A. Record the availability of off-duty C3 as a backup in case the planned reassignment cannot go ahead. Plan the change before Shift 1 starts: D3 will move from Shift 1 to Shift 2, rather than work both shifts.

Prepare the Team Shortage#

  1. On the same exercise date, remove the temporary assignment for A3 from the preceding exercise using Remove > Remove Temporary Assignment > Remove. Keep the absence of A4 recorded.
  2. Check the additional participants before proceeding:

    Employee Starting assignment Qualification and exceptions
    D3 TeamD, Shift 1, ControllerAssembly. Both operating Certifications are Active; no absence, pool, availability, or temporary-assignment exception.
    C3 TeamC, off-duty, normally ControllerAssembly. Both operating Certifications are Active; Employee Calendar Day exists, no absence or other exception, and work availability is unset.

    Table: Cross-team participants

  3. Select only A2 on the exercise date. Select Set Non-Working Days, choose Absence, and select Set.

  4. Select the absence record for A4 and Validate. Inspect Shift 2: Assembly has A1 and A3 against a requirement of two; Final Test has no technician against a requirement of one. Moving A3 would now create an Assembly shortage, so leave A3 in place.

    Employees A2 and A4 Absent

Useful Documentation

For the illustrated procedures in this section, see:

Offer Employee Through the Pool#

  1. Inspect the Shift 1 staffing of Team D. Confirm three Assembly Operators (D1, D2, D3) and one Test Technician (D4). Releasing D3 would leave the two required Assembly Operators.
  2. Select only D3 on the exercise date. Confirm Is Employee Working Day is true, Is In Pool is false, and Is Temporarily Assigned is false.
  3. Select Place In Pool, review the Employee and date, and select Place.
  4. Confirm Is In Pool is true. D3 is offered for reassignment but still has the normal Team D assignment. Pool placement alone does not fill the shortage in Team A.

    Pool Employee D3

Useful Documentation

For the illustrated procedures in this section, see:

Record Employee Availability as a Backup#

D3 remains the intended replacement. Record the availability of C3 so there is a possible backup if D3 cannot cover the absence. Availability alone does not assign C3 to the shift.

  1. Select only C3 on the same date. Confirm Is Calendar Working Day is true, Is Employee Working Day and Is Available To Work are false, and Non-Working Day Type is unset.
  2. Select Set Work Availability, review the Employee and date, and select Set.
  3. Confirm Is Available To Work is true while C3 remains off-duty. Pool placement is for a working Employee; work availability is for an off-duty Employee. Neither operation alone creates a temporary assignment.

    Work Availability Employee C3

Useful Documentation

For the illustrated procedures in this section, see:

Temporarily Assign Employee to Team#

  1. Select only D3 on the exercise date.
  2. Select Assign Temporarily and enter:

    Field Value
    Workgroup ControllerFinalTest
    Team TeamA
    Position ControllerTestTechnician

    Table: Cross-team temporary destination

  3. Select Assign. Confirm Is Temporarily Assigned is true and the saved destination is TeamA / ControllerFinalTest / ControllerTestTechnician on Shift 2. Verify that D3 is no longer counted on Shift 1 of Team D. If the displayed assignment does not match, resolve the discrepancy before accepting the coverage change.

    Employee D3 Temporarily Assigned

Useful Documentation

For the illustrated procedures in this section, see:

Verify Coverage in Both Teams#

  1. Select the Employee Calendar Day for A4 and select Validate.
  2. Verify the assignments directly and inspect the current validation results:

    Team and shift Assembly: required / available Final Test: required / available
    TeamA, Shift 2 2 / 2: A1, A3 1 / 1: temporarily assigned D3
    TeamD, Shift 1 2 / 2: D1, D2 1 / 1: D4

    Table: Staffing after cross-team reassignment

  3. Confirm the Final Test shortage in Team A is resolved without creating a shortage in Team D. Team B remains unchanged on Shift 3, including its Assembly surplus. C3 remains an unassigned backup.

    Validation

Useful Documentation

For the illustrated procedures in this section, see:

In the first scenario, Assembly had enough qualified Employees to cover Final Test internally. In the second, another absence removed that flexibility, so coverage came from Team D while preserving its required staffing. C3 remained available as a backup.

Return to Shift Planning to review the configuration and learning path.