Assembling With a Carrier Attached#
Use this final scenario after Removing a Carrier to see how assembly frees a Carrier once it consumes the Material carrying it. Consider the Bonding Step at the FGood Flow.
Preconditions#
- The
FGood.01material has reached theBondingstep. - The
SemiFGmaterial** still has the Frame carrier attached.
Sequence of Steps#
1. Track in the FGood.01 material#
- At the
Bondingstep, select theFGood.01material. -
Perform Track-In. The
FGood.01material consumes theSemiFG.01material with the Frame carrier attached.
2. Assemble the material#
- On the left side menu, select Business Data.
- On the Business Data panel, select Material.
- In the search box, type
Mat.01. - Select the corresponding Material from the search results.
-
On the top ribbon, select Assemble.
Result#
After assembling, the material releases the carrier, which becomes available again for use in another material.

