Removing a Carrier#

This tutorial describes how to remove one of two carriers attached to a Material, while the other carrier stays attached and continues with the Material. Consider the Delamination Step at the SemiFG Flow.

Preconditions#

  • The SemiFG.01 material already has two carriers attached:
    • The SemiFG carrier, attached at the SemiFGLotCreation step.
    • The Frame, attached at the Lamination Step.
  • The SemiFG.01 material has reached the Delamination step.
  • A Material Carrier Context entry defines a Remove Operation for SemiFG Carriers at the Delamination Step.

    Screenshot showing the Material Carrier Context entry that removes the SemiFG Carrier at the Delamination step.

  • The Carrier Material Verification Mode is set to At Track Out.

    Screenshot showing the Carrier Material Verification Mode set to At Track Out.

If the operator does not remove the SemiFG carrier from SemiFG.01 before it tracks out, the system prevents the Track-Out action and displays an error indicating that the operator must, first, remove the carrier.

Sequence of Steps#

1. Open the Delamination step#

Login to MES and proceed as follows:

  1. On the left side menu, select Business Data.
  2. On the Business Data panel, select Step.
  3. In the search box, type Delamination.
  4. Select the corresponding step from the search results.

2. Remove a carrier#

  1. On the top ribbon, select the Step View tab.
  2. On the Materials table, select the SemiFG.01 checkbox.
  3. On the top ribbon, select More.
  4. On the dropdown menu, select Manage from the Carrier Materials section.
  5. Select the garbage can icon next to the sub-material to remove the carrier.
  6. Select the Save button to save the change.

    Screenshot showing the Manage Carrier Materials dialog while removing the SemiFG Carriers.

Result#

After removal, the SemiFG carriers, the operator can track out the SemiFG.01 material. The the carriers change to Queued state and the operator can reuse them in another step.

Screenshot showing the CarrierStorage step with the detached SemiFG Carriers back in the Queued state.

The second carrier remains attached and continues with the material to SemiFGStorage.

Screenshot showing the Carriers tab with only the Frames still attached to each sub-material.

Next scenario: Assembling With a Carrier Attached