Track-Out and Material Move-Next#
Material.TrackOutAndMoveNext
This wizard combines the Track Out and Material Move Next functionality in a single transaction
During this operation, CM MES evaluates conditions on optional Flow Items when determining the next Step. If a condition is not met, the Material skips that item and proceeds to the next eligible Step. For information about configuring these conditions, see Optional Flow Items.
For more information, please refer to the Track Out and Material Move Next wizards information.
Info
If the Track-Out and Material Move Next by Default flag is true for a given Step, in Step View, Resource View and Material Details, the Track-Out and Material Move Next operation remains in the ribbon and the Track-Out operation is moved to the More section of the ribbon. If the Track-Out and Material Move Next by Default flag is false, the Track-Out operation will remain in the ribbon and the Track-Out and Material Move Next is moved to the ribbon.
Warning
In order to configure a Checklist or Data Collection to be used on any of the operations and the system currently has Track-Out and Move-Next combined as a single transaction, the configuration in the appropriate context table must specify the first operation (Track-Out) as the trigger operation so that it is displayed appropriately. For more information, see MaterialChecklistContext or MaterialDataCollectionContext.