Performance#
This folder contains reports that make calculations over a certain period of time.
It contains the following standard reports:
- Material Facility Cycle Time
- Material Losses
- Material Pass Test
- Material State Time Distribution
- Material Step Cycle Time
- Material Volume and Yield
- Material Yield Loss
- Resource OEE
- Resource Performance
- Resource State Time Distribution
For all performance reports, the system always considers the Civil Calendar and the day as starting at 00h00. The start date at 00h00 and the end date as the next day of the end date at 00h00. When filtering at the shift level, only the portion of the shift that falls within the selected interval is considered.