SchedulingTransferMaterialSize#
Description#
Used to resolve the Transfer Material Size for a specific context.
Fields#
The SchedulingTransferMaterialSize table has the following fields:
| Field | Description | Key | Mandatory | Comments |
|---|---|---|---|---|
| Step | Reference to a Step | Yes | Yes | |
| Product | Reference to a Product | Yes | No | |
| ProductGroup | Reference to a ProductGroup | Yes | No | |
| TransferMaterialSize | The Transfer Material Size to be considered – with how many units completed from the current Step can the following Step of the Material be scheduled. | No | Yes |
Table: SchedulingTransferMaterialSize fields
Precedence Keys#
The search precedence rules are the following:
- Step, Product
- Step, ProductGroup
- Step