Manage Shipping Facilities#
Overview#
This operation is used to manage the Facilities that are available to be shipped to from a Facility.
Setup#
No specific setup is required other than to meet the preconditions of the transaction.
Preconditions#
- The local Facility exists in the system.
- The remote Facilities exists in the system.
Sequence of Steps#
To manage the Facilities that can be shipped to from the current Facility, there is a button labeled Manage in the Shipping tab of the current Facility. Pressing the button opens a wizard where the data can be configured:
- Add as many Facilities as desired in the left side panel.
-
Each added Facility should be configured on the right side panel by selecting the desired Facility. Read-only information will be displayed on the selected Facility:
- Description - selected Facility description
- Type - selected Facility Type
- Is Remote - information on whether the Facility is located locally or if it is remote. A remote Facility represents another Critical Manufacturing instance.
-
Pressing Update will update the list of Facilities and return to the main screen.
