Below you can see a list of all Dynamic KPIs available out of the box in Critical Manufacturing MES:

KPI Entity Type Manual Calculation Description Dimension KPI Type Parameter
Average Assist Time - Resource The average time between the start and end of Assist Events for the selected Resource. - Current Day
- Current Shift
- Last 3 Days
- Last 7 Days
- Current Week
- Current Month
- Current Order
Minimum KPI Hours
Average Changeover Time - Resource The average Setup Time of complete Setup transitions for the selected Resource. - Current Day
- Current Shift
- Last 3 Days
- Last 7 Days
- Current Week
- Current Month
Minimum KPI Minutes
Closed Protocol Duration by Type and Severity - Protocol Instance The duration of Protocol Instances having the System State Closed by Type and Severity. - Current
- Current Day
- Current Week
- Current Month
Minimum KPI Hours
Closed Protocol Duration by Type - Protocol Instance The duration of Protocol Instances having the System State Closed by Type. - Current Day
- Current Week
- Current Month
Minimum KPI Long
Closed Protocol Instances - Protocol Instance The Number of Protocol Instances in SystemState = Closed - Current Day
- Current Week
- Current Month
Minimum KPI Long
Completed Production Orders - Facility
- Product Group
The number of Completed Production Orders for the selected entity. - Current Day
- Current Shift
- Last 3 Days
- Last 7 Days
- Current Week
- Current Month
- Current Order
Maximum KPI Long
Completed Quantity - Facility
- Product Group
The Quantity Completed for the selected entity. - Current Day
- Current Shift
- Last 3 Days
- Last 7 Days
- Current Week
- Current Month
Maximum KPI Decimal
Components Placed Per Hour - Resource The average number of components placed per hour registered on component placement Events for the selected Resource. - Current Day
- Current Shift
- Last 3 Days
- Last 7 Days
- Current Week
- Current Month
- Current Order
Maximum KPI Decimal
Defective Units Count - Area
- Facility
- Resource
The Material Primary Quantity Loss for the selected entity. - Current Day
- Current Shift
- Last 3 Days
- Last 7 Days
- Current Week
- Current Month
Minimum KPI Decimal
Down Reason Count - Resource The Reasons for the changes to Universal State Unscheduled Down for the selected Resource. - Current Maximum None
Down Reason - Resource The Down Reason for the selected Resource with System State set as Down. - Last 7 Days Deviation None
Equipment Recipe - Resource The Recipe of the selected Resource. - Current Deviation None
Equipment State - Resource The Universal State of the selected Resource. - Current
- Last 7 Days
Deviation None
Fault Count - Resource The number of Fault Events for the selected Resource. - Current Day
- Current Shift
- Last 3 Days
- Last 7 Days
- Current Week
- Current Month
- Current Order
Minimum KPI Decimal
First Pass Yield - Resource The number of OK Units Inspected Events divided by the number of OK and NOK Units Inspected Events for the selected Resource. - Current Day
- Current Shift
- Last 3 Days
- Last 7 Days
- Current Week
- Current Month
Maximum KPI Decimal
Job Remaining Time - Resource The remaining process time of the last tracked-in Material in the selected Resource. - Current Maximum KPI Decimal
Loss Reason Sum - Area The sum of the losses per Reason recorded in the selected Area. - Last 7 Days Minimum KPI Decimal
Material Completed Quantity - Material The Processed Quantity of the oldest tracked-in Material in the selected Resource. - Current Maximum KPI Long
Material Customer - Resource The Customer of the Production Order of the oldest tracked-in Material in the selected Resource. - Current Deviation None
Material Elapsed Time - Material The start processing date of the oldest Material tracked-in in the Resource. - Current Minimum KPI DateTime
Material Estimated Remaining Time - Material The time until the Planned End Date of the oldest tracked-in Material in the selected Resource. - Current Minimum KPI DateTime
Material Product Description - Resource The Product Description of the oldest tracked-in Material in the selected Resource. - Current Deviation None
Material Product - Resource The Product of the oldest tracked-in Material in the selected Resource. - Current Deviation None
Material Progress - Material The progress of the Material's Completed Quantity of the oldest tracked-in Material in the selected Resource. - Current Maximum KPI Percentage
Material Quantity - Material The Quantity to Process of the oldest tracked-in Material in the selected Resource. - Current Deviation KPI Long
Material Remaining Quantity - Material The remaining Quantity to Process the oldest tracked-in Material in the selected Resource. - Current Minimum KPI
Material Units Produced - Resource The number of Units Produced Events for the selected Resource. - Current Order - KPI Decimal
Medium Time Between Assists - Resource The average time between Assist Events for the selected Resource. - Current Day
- Current Shift
- Last 3 Days
- Last 7 Days
- Current Week
- Current Month
- Current Order
Minimum KPI Hours
Missing Volume by Item - Plan The delta between the Planned Volume and the Actual Volume - the unfulfilled volume per Time Frame, per Item - User Defined - KPI Decimal
MTBF - Area
- Facility
- Resource
The Mean Time Between Failures for the selected entity. - Current Day
- Current Shift
- Last 3 Days
- Last 7 Days
- Current Week
- Current Month
Maximum KPI Hours
MTTR - Area
- Facility
- Resource
The Mean Time To Repair for the selected entity. - Current Day
- Current Shift
- Last 3 Days
- Last 7 Days
- Current Week
- Current Month
Minimum KPI Hours
OEE - Area
- Facility
- Resource
The Overall Equipment Effectiveness for the selected entity. - Current Day
- Current Shift
- Last 3 Days
- Last 7 Days
- Current Week
- Current Month
Maximum KPI Percentage
On Hold Quantity - Area
- Facility
- Step
The total Quantity placed on Hold in the selected entity. - Current Day
- Current Shift
- Last 3 Days
- Last 7 Days
- Current Week
- Current Month
Minimum KPI Decimal
On-Time Delivery (%) - Facility
- Product Group
The percentage of Production Orders closed at least until their Due Date for the selected entity. - Current Day
- Current Shift
- Last 3 Days
- Last 7 Days
- Current Week
- Current Month
Maximum KPI Percentage
On-Time MAOs - Area
- Facility
The ratio of on time completed MAOs (before Late Due) for the selected entity. - Current Day
- Current Shift
- Last 3 Days
- Last 7 Days
- Current Week
- Current Month
Maximum KPI Percentage
Open Protocol Instances by Type - Protocol Instance The Number of Protocol Instances having the System State Open by Type. - Current Minimum KPI Long
Open Protocol Instances - Protocol Instance The Number of Protocol Instances having the System State Open. - Current Minimum KPI Long
Pending Corrective MAOs - Area
- Facility
The Pending Corrective MAOs for the selected entity. - Total
- By State
Minimum KPI Long
Pending Late Production Orders - Facility
- Product Group
The number of Pending Late Production Orders for the selected entity. - Current Minimum KPI Long
Pending Late Quantity - Facility
- Product Group
The Pending Late Quantity for the selected entity. - Current Minimum KPI Decimal
Pending Preventive MAOs - Area
- Facility
The Pending Preventive MAOs for the selected entity. - Total
- By State
Minimum KPI Long
Performance Efficiency - Resource The Performance Efficiency percentage for the selected Resource. - Current Day
- Current Shift
- Last 3 Days
- Last 7 Days
- Current Week
- Current Month
Maximum KPI Percentage
Placement Efficiency - Resource The number of placed components divided by the number of placed and misplaced components registered on component placement Events for the selected Resource. - Current Day
- Current Shift
- Last 7 Days
- Current Week
- Current Month
Maximum KPI Percentage
Quality Affected Quantity Dataset - Area
- Facility
- Step
A Dataset containing information about the Quantity put on Hold, sent to Rework, and/or Lost for the selected entity. - Last 7 Days Minimum KPI Decimal
Rate of Quality - Resource The Rate of Quality percentage for the selected Resource. - Current Day
- Current Shift
- Last 3 Days
- Last 7 Days
- Current Week
- Current Month
Maximum KPI Percentage
Reject Rate - Resource The number of rejected components divided by the number of total components for the selected Resource. - Current Day
- Current Shift
- Last 7 Days
- Current Week
- Current Month
Minimum KPI Percentage
Resources Down - Area The number of Resources with System State Down for the selected Area. - Current Minimum KPI Decimal
Resources Up - Area The number of Resources with System State Up for the selected Area. - Current Maximum KPI Decimal
State - Resource The Universal State for the selected Resource. - Current
- Last 7 Days
- None
Throughput Rate - Plan The Produced Quantity per Unit Time, per Manufacturing Unit, connected to a Plan - User Defined - KPI Decimal
Top Products by Loss Quantity - Facility
- Product Group
The Products with the highest Loss Quantities for the selected Product Group. - Current Day Top 10
- Current Shift Top 10
- Current Week Top 10
- Current Month Top 10
Minimum KPI Decimal
Top Reasons by Lost Quantity - Facility
- Product Group
The Loss Reasons with the highest Lost Quantity for the selected Product Group. - Current Day
- Current Shift
- Current Week
- Current Month
Minimum KPI Decimal
Top Reasons by Quantity on Hold - Facility
- Product Group
The Hold Reasons with the highest Quantity on Hold for the selected Product Group. - Current Day
- Current Shift
- Current Week
- Current Month
Minimum KPI Decimal
Top Resources with AdHoc Maintenance - Area
- Facility
The Resources with the most requests for AdHoc Activities for the selected Facility. - Current Day
- Current Shift
- Last 3 Days
- Last 7 Days
- Current Week
- Current Month
Minimum KPI Long
Unit Cycle Time - Resource The average processing time per unit for the selected Resource. - Current Day
- Current Shift
- Last 3 Days
- Last 7 Days
- Current Week
- Current Month
Minimum KPI Seconds
Uptime % - Resource The Up Time percentage of the selected Resource. - Current Day
- Current Shift
- Last 3 Days
- Last 7 Days
- Current Week
- Current Month
Maximum KPI Percentage
Volume Fulfilment - Plan The Percentage of the Total Planned Volume in the Plan that was achieved. - User Defined - KPI Percentage
Volume In - Resource
- Step
The In Process Quantity registered for the selected entity. - Current Shift
- Last 7 Days
Maximum KPI Decimal
Volume Out - Resource
- Step
The Processed Quantity registered for the selected entity. - Current Shift
- Last 7 Days
Maximum KPI Decimal
Yield - Area
- Facility
- Resource
- Step
The Processed Quantity divided by the Processed Quantity plus the In Process and the Processed Quantity Losses registered for the selected entity. - Current Day
- Current Shift
- Last 3 Days
- Last 7 Days
- Current Week
- Current Month
Maximum KPI Percentage

Table: Available Dynamic KPIs

In the above table, the KPIs marked with a need to be calculated by the user through the following steps:

  1. Storing the necessary data in a database where the data will be accessed;
  2. Creating a DEE Action to perform the required calculation on that data;
  3. Attaching that DEE Action to a Rule;
  4. Changing the Source Type of the KPI Dimensions to Rule, and associating the created Rule.

This leads to the data being displayed in dashboards with out-of-the-box KPIs not being ready to be used unless there are extra steps performed to allow applying the calculations to the retrieved values.