Dispatch Material#
Material.Dispatch
Overview#
This operation is used to assign a Material to be processed at a certain Resource. It acts as a Material reservation for a given Resource. A Resource can be any Resource - physical or virtual.
Info
This transaction is available for multiple Materials from the Resource and Step View.
Setup#
To enable the dispatch of a Material to a Resource it is necessary to:
- Have a Resource of Processing Type Process with a Service associated and enabled in the same Facility of the Material. The Resource must be dispatchable.
-
The Material required Service (the Service Context defined at the Step level) at its current Step must match the Service defined in 1.
Note
The Service must be enabled globally, and the Material must be dispatchable.
Preconditions#
- Material is Active.
- Material is not On Hold and not In Transit.
- Material has no Required Future Action set.
- Material is Dispatchable and Queued.
- Material is a Topmost Material, that is, it has no Parent Material defined.
- Resource exists, is Active and is Dispatchable.
- Resource is a Top level Resource, that is, it has no Parent Resource and the Processing Type is Process or Line.
- Material and Resource are at the same Facility and Step.
- Step is not a Pass-Through Step.
- Material must have the Current Material Transfer property set to
Null. - Resource Dispatch Scheduling Type must be Dispatching.
- Material must not have a required Future Action associated.
- Resource has Lane Count > 0 and has Is Multilane Active set to
True, in this case a valid Lane of the Resource must be provided. - Materials are dispatched to the same Resource and Lane.
- Resource position management must be automatic.
Preconditions for Bulk#
-
In addition to the preconditions mentioned above, all Materials must:
- Be at the same Facility.
- Be dispatched to the same Resource and Lane.
- Have the Track Positions property in the Resource set to
false, or have both the Track Positions and the Auto Generate Positions properties set totrue.
Sequence of Steps#
The Material can be dispatched from the perspective of the Resource or from the perspective of the Material.
Perspective of the Material#
This step is used to select the Resource for which to dispatch the Material.
- Optionally, review the Material details by expanding the Material section.
- In the Available Resources list, choose a Resource to dispatch the Material to.
-
If the Material Required Setup is different from
null, the system will display a visual indicator, and filter (SETUP READY), so you can select Resources that do not need a setup before processing: -
In the Resource Details section, review the information related to the chosen Resource.
- If the Resource has Lanes configured, select a valid Lane of the Resource.
- In the Resource Order, choose the Queue Order for the Material: First or Last, whether a LIFO (Last-In, First-Out) or a FIFO (First-In, First-Out) logic is desired, respectively. FIFO is chosen by default.
- If the Resource does not auto-manages its positions, it is necessary to specify the position of the Material (if the Resource capacity is expressed in Materials) or the position(s) of the Material Container(s) (if the Resource capacity is expressed in Containers) in the Resource. The position(s) reflects a physical location.
- Optionally, add a Comment.
-
Select Dispatch to complete the operation:
Perspective of the Resource#
This step is used to select a Material to dispatch in the current Resource.
- Optionally, review the Resource details by expanding the Resource section.
- If the Resource has Lanes configured (Is Multilane Active enabled), select a valid Lane of the Resource, and then select Next.
- Select the Material to be dispatched.
-
If the Resource Setup Mode is different from Not Required, the system will display a visual indicator, and filter, so you can select Materials that do not need a setup before processing:
In this filter you can also select to only see Setup Ready Materials:
-
In the Material Details section, review the information related to the chosen Material.
- In the Resource Order, choose the Queue Order for the Material: First or Last, whether a LIFO (Last-In, First-Out) or a FIFO (First-In, First-Out) logic is desired, respectively. FIFO is chosen by default.
- If the Resource does not auto-manages its positions, it is necessary to specify the position of the Material (if the Resource capacity is expressed in Materials) or the position(s) of the Material Container(s) (if the Resource capacity is expressed in Containers) in the Resource. The position(s) reflects a physical location.
- Optionally, add a Comment.
-
Select Dispatch to complete the operation:
Note
If the Material is In Store, it will be automatically retrieved from store.