Synchronize Map Quantity#
Material.SynchronizeMapQuantity
Overview#
This operation is used to synchronize the Material quantity with the Map quantity.
Setup#
No setup is required other than to meet the preconditions of the transaction.
Preconditions#
- The Material exists and is Active.
- The Map is currently associated with the Material.
- The selected Map default layer is either of Loss or Bin type and it is the current Master Map.
Sequence of Steps#
Step 1: Details#
- Open the Maps tab and select the desired Map from the list, by clicking on its line.
- Click Synchronize and confirm the Map information.
- Optionally, enter a comment.
- Press Synchronize to complete the transaction.