Skip to content

Synchronize Map Quantity#

🔒 Material.SynchronizeMapQuantity

Overview#

This operation is used to synchronize the Material quantity with the Map quantity.

Setup#

No setup is required other than to meet the preconditions of the transaction.

Preconditions#

  • The Material exists and is Active.
  • The Map is currently associated with the Material.
  • The selected Map default layer is either of Loss or Bin type and it is the current Master Map.

Sequence of Steps#

Step 1: Details#

  1. Open the Maps tab and select the desired Map from the list, by clicking on its line.
  2. Click Synchronize and confirm the Map information.
  3. Optionally, enter a comment.
  4. Press Synchronize to complete the transaction.

synchronize_map_quantity