Complete Setup#
Resource.CompleteSetup
Overview#
This operation is used to mark the Resource as not being in Setup anymore.
Setup#
No special setup is required other than to meet the preconditions of the transaction.
Preconditions#
- The Processing Type of the Resource is Process or Line.
- The Resource property In Setup must be
true. - If the Resource Setup Mode is different from Not Required:
- All Documents that must have been Read and Understood were Read and Understood.
- The Resource Current Setup Checklist Instance must be Completed.
- All the Durables and Consumables must be set in the right positions and quantities.
- The Recipe, if set manually, must match with the required Setup Recipe.
Sequence of Steps#
You can perform this operation from several points of entry:
- From the Material - from the Material details page, select the Complete Setup button on the top ribbon to open the wizard.
- If available, from the Production Order Step - from the Resource details page, go to the Schedule View, select the Production Order Step and select the Complete Setup button on the top ribbon to open the wizard.
- From the Resource - the Resource is already selected, select the Complete Setup button on the top ribbon to open the wizard.
Step 1: Setup Mode Not Required#
- Select a Resource matching the preconditions.
-
If the Setup Mode of the Resource is Not Required, select the Complete Setup button on the top ribbon to open the wizard:
-
As the state of the Resource is subject to being changed, select a new state from the drop-down list. In case that the state transition is associated with Reasons, you can accept the suggested Reason or select another one:
-
The system will suggest a default transition, and if applicable, also a Reason, which you will be able to override.
- Optionally, enter a comment.
- Select Begin to complete the operation.
Step 1: Setup Mode Is Required#
-
If the Setup Mode of the Resource is Always or On Changeover, select the Complete Setup button on the top ribbon to open the wizard:
-
The system will suggest a default transition, and if applicable, also a Reason, which you will be able to override.
- Optionally, enter a comment.
-
Select Complete to complete the operation.
Info
If Running Mode and Lane configurations have been set, this information will also be available.
Note
If the Resource is a Top-Most Resource and its Processing Type is Line, you have the option to also Complete Setup for All Sub-Resources.
The default is taken from the GUIElementDefaultValue Generic Table with the following information: Context = Resource.CompleteSetup, Element = BeginSetupForAllSubResources, and Value = True (by default).