Skip to content

Manage Resource Material Consumables#

🔒 Resource.ManageMaterialConsumables

Overview#

This operation allows you to Manage the Material Consumables at a particular Resource.

Setup#

No setup is required other than to meet the preconditions of the transaction.

Preconditions#

  • The Resource exists and is Active.
  • The Processing Type of the Resource is Process Or Line.
  • The Material exists, is Top-Most and is Dispatched or In Process at the Resource.

Sequence Of Steps#

  1. Select a Resource matching the preconditions.
  2. In the Resource View of the Resource, select the Material matching the preconditions:

    Screenshot showing a Resource View with a selected Material matching preconditions.

  3. Select the Manage button on the top ribbon, and then select the Consumables option:

    Screenshot showing the Manage button on the top ribbon with Consumables option selected.

    Note

    If you select Consumables without selecting a Material, the Manage Consumables operation is called.

  4. In the wizard select and manage the Consumables change(s) you need:

    Screenshot showing a wizard step for managing consumable materials.

  5. Optionally, enter a comment.

  6. Select Update to complete the operation.

Info

The wizard displayed here is the same as the one used in the Perform Setup operation.