View Setup#
Resource.ViewSetup
Overview#
This operation is used to View the setup for the processing of one Material at one Resource. This is only a visualization facility.
Note
This use-case can only be triggered from the Resource View as it requires both the context of a Material and a Resource.
For more information see, View Line Setup.
Setup#
No special setup is required other than to meet the preconditions of the transaction.
Preconditions#
- The applicable Resource exists, it is Active and the Processing Type is Process or Line.
- The selected Material must exist and be Active, Queued or Dispatched, at the applicable Resource, and must be Top-Most.
Sequence of Steps#
Step 1: Resource#
- Select a Resource and then select View Setup.
-
The Resource details will be displayed. Review the information and then Close.
Step 2: Documents#
Note
This Step is only available if there are Documents associated with the Resource.
Step 3: Durables#
Note
This Step is only available if there are Durables required for the Material at the Step.
Step 4: BOM#
Note
This Step is only available if there is a BOM required for the Material at the Step and only if the Material is Top-Most.
Note
If there is a BOM of scope Materials associated to a Material that has characteristics, the BOM will be displayed with the characteristics of the Material.
Info
BOMs are configured in the Step BOM Context.
Step 5: Recipe#
Note
This Step is only available if the Resource on which the Material is being tracked-in is configured to enable Recipe Management.
Step 6: Instruments#
The system displays all the Parameters to be measured, showing which ones have at least one available instrument and which ones do not. A list of all attached instruments to the Resource is also displayed.
Note
Recipes are configured in the Service Recipe Context.