Skip to content

Create Split Send-Ahead Run#

🔒 SendAheadRun.Edit

Overview#

This operation is used to split any Waiting Materials associated to a Send-Ahead Run and add the Sub-Materials as send-ahead Materials.

Setup#

No specific setup is required other than to meet the precondition of the transaction.

Preconditions#

  • Materials must be Waiting Materials in a Send-Ahead Run.

Sequence of Steps#

The Record Send-Ahead Run Result wizard can be called from the Send-Ahead Run page within the Business Data Group.

Step 1: Waiting Materials#

Info

For this operation to be called directly from the Send-Ahead Run page, the Capture Results Mode must be set to Manual.

  1. Selecting a Send-Ahead Run that matches the preconditions, navigate to the Materials section and within that section open the Send-Ahead Materials tab.
  2. Select a waiting Material by ticking the appropriate row.
  3. Select the Create Split button on top of the grid to open the wizard.
  4. Define the Split Type for the send-ahead scenario:
  5. None
  6. Logical
  7. Physical
  8. If the Split is defined as Logical or Physical, define the Split Scope. There are two options:
  9. Temporary
  10. Permanent
  11. If the Split is defined as Logical or Physical, optionally define the default Container for the Sub-Materials.
  12. Select Next to continue to the next section

Step 2: Sub-Materials to Send-Ahead#

  1. Select which of the Sub-Materials to be included in the Send-Ahead Run. At least one Sub-Material must be selected. After you select the Sub-Materials, select Next to continue to the next section.
  2. Select Create to complete the operation.

Screenshot showing a UI with "Create" button selected, related to sending sub-materials for a project called "Gooste Sp Send Awad".