Skip to content

Automatic Track-Out#

Overview#

This feature enables Automatic MES material Track-Out to the current Resource.

Currently supported events Keys:

*551TraceDataComponentRequest (This is also used when you want to Track-Out using 550 TraceData Event) * 602MachineEvent

How To Configure#

Relevant Artifacts#

The table below describes the properties for this entity type:

Name Type Is Mandatory Data Type Description
IoTMetadataDefinition SmartTable Yes Metadata configuration for equipment integration
IoTMaterialOperations Service Yes Service that handles Material Operations requests form equipment in MES

How It Works#

When a event that is enabled to Track-Out the material out of the resource is received we will:

  • Check Conditions

    • Wait for traceability data to be processed(If configured).
    • When timeout is reached will continue.
  • Perform Track-Out

    • Trigger the configured PanaCIM event (usePanaCIMToTrackIn).
    • Execute MES operation (ComplexTrackOut or ComplexTrackOutAndMoveNext).

The Controller will call MES DEE IoTMaterialOperation to handle the tracking operation.

Assumptions#

SmartTable IoTMetadataDefinition is configured, other than the general setup keys (check Setup for more information), with the following entries for each station:

Resource ResourceType Area Name Value Description
MES PanaCIM Station X Resource usePanaCIMToTrackOut Supported Event String Track In Material with the chosen event.See List at the top of this page.
MES PanaCIM Station X Resource waitForTraceToDoTrackOut True Activate wait for track-out to finish on previous PanaCIM module.
MES PanaCIM Station X Resource useWaitTimeout True Set max waiting time. (10 = 1000 ms)
MES PanaCIM Station X Resource useTrackOutOperation True MES Track-Out operation to be performed on the current Material. ComplexTrackOut or ComplexTrackOutAndMoveNext. Defaults to ComplexTrackOut if not defined.