--- pdfexport: true alias: tutorials-sched-holds tags: - scheduling description: "This documentation outlines scheduling rules for materials with existing and future holds" --- # Scheduling Holds and Future Holds Scheduling can take into consideration possible holds and future holds that have been placed on Materials. ## Holds Materials that are currently on hold can be treated one of two ways, according to the Holds Processing Mode property, defined at the Schedule level: * Included: Materials with holds will be considered in Scheduling normally. * Excluded: Materials with holds will be excluded from Scheduling. ## Future Holds Materials that have future holds can be treated one of two ways, according to the Future Holds Processing Mode property, defined at the Schedule level: * Ignore: Materials will be scheduled normally, as if the future holds did not exists. * Stop: Materials will be scheduled only partially: * If the first future hold which the Material will be subject to is of state Queued, it will scheduled up until the previous Step of that future hold. * If the first future hold which the Material will be subject to is of state Processed, it will scheduled up until the Step of that future hold.