--- alias: tutorials-durables-management-two-durable-products description: "Run the second durables scenario by requiring two durable products during track-in." --- # Scenario 2: Use a BOM with Two Durable Products Use this scenario to validate a **Material** that requires two **Durables** during setup and track-in. Use this scenario after [[tutorials-durables-management-single-durable-product]] to extend the same flow from one required **Durable** to two. !!! warning Before you add or remove Durables from the Resource, confirm that no Materials are in process. Abort or track out the previous Material before you continue. 1. Select the `Engine Block H08-P9.006` **Material** on the `Expose` **Step** or on the `Ultratech Stepper 01` **Resource** view, and select **Track-In**. 1. If no **Durable** is assigned, the wrong **Durable** is assigned, or the **Durable** is attached to the wrong position, the system blocks the operation. ![Screenshot showing the track-in error raised when the two required durables are not available.](../images/scenario_two_track_in_error.png) 1. Open the **Resource** view and select **Perform Setup**. ![Screenshot showing the Perform Setup operation for the resource.](../images/scenario_two_perform_setup.png) 1. Review the durable information that the system resolves for each position, and assign the required **Durables**. ![Screenshot showing the setup view with the required durables resolved per position.](../images/scenario_two_required_durables.png) 1. Confirm the assigned **Durables** on the **Durables** page of the **Resource**. ![Screenshot showing the resource durables page after the two required durables were assigned.](../images/scenario_two_resource_durables_page.png) 1. Select the same **Material** again and select **Track-In**. The wizard now shows both required **Durables** for the material context. ![Screenshot showing the track-in wizard with the two resolved durables.](../images/scenario_two_track_in_wizard.png) 1. After track-in, verify the durable usage on the **Material Traceability View** and on the **Material History Report**. After you validate the two-durable setup, continue to [[tutorials-durables-management-contains-durables-library]]. The next scenario keeps the same durable rules but manages the **Durables** from a library on the **Resource**. Watch the recorded walkthrough below. {% set video_id = 'a1e3c8f071e1459156083bf71d9f88b1' %} {% include-markdown 'includes/cloudflare_stream.md' %}