--- alias: user-guide-manage-inspection-plan-steps description: "Manage inspection plan steps by adding, modifying, and updating individual steps within the plan" --- # Manage Inspection Plan Steps :lock: Resource.**Edit** ## Overview This operation is used to manage all the steps associated to a specific **Inspection Plan**. ## Setup No setup is required other than to meet the preconditions of the transaction. ## Preconditions * The **Inspection Plan** exists and it is in state Created. ## Sequence of Steps ### Step 1 1. Select an appropriate **Inspection Plan**, navigate to the Steps section and press the **Manage** button. 2. Add as many Inspection Plan Steps as desired (press :material-plus: in the top right of the grid to add, and :material-trash-can: to remove, ordering the contexts with the :material-arrow-up: and :material-arrow-down: buttons) - specifying one Step minimum - providing for each Step the following information: * If the Inspection takes place at the same Step where the Inspection Plan is triggered, set *Is in Process Inspection* to `true`. !!! note This removes the need for any other Inspection Plan Step configuration. * If the *Is in Process Inspection* is set as `false`, specify the following information: * The Inspection **Flow** and **Step** where the **Inspection Plan** shall be performed. * The Split Type to be performed: * None - No Split. * Permanent - The **Material** will be Split and transformed into several Child Materials. * Temporary - The **Materials** created during the Inspection Plan Step shall be merged back with the original Material at the end of the **Flow**. * If a Split is to be performed, specify the Split Mode: * Inspection Step - select one of the Inspection Plan Steps to be used as a Split **Step** * Process Step - the Split will be performed in the same **Step**. * Choose whether to scrap the **Material** sample used for the inspection. If set as `true`, select the appropriate **Reason** for the scrap. !!! info The steps can also be copied from other steps that belong to an existing version of the same **Inspection Plan**, by using the Copy Steps option. !!! warning If the **Inspection Plan** contains an In-Process Inspection **Step** and the Results Required Before Track Out property is set to `true`, both the Close Automatically on Pass and Close Automatically on Fail properties must be set to `true`. 3. Select **Update** to complete the operation. ![Screenshot showing a management interface for inspection plans, highlighting the first step in the process.](images/manage_inspection_plan_steps.png)