--- alias: user-guide-terminate-inspection-plan description: "This documentation details how to end an inspection plan operation" --- # Terminate Inspection Plan :lock: InspectionPlan.**Terminate** ## Overview This operation is used to Terminate a Inspection Plan. ## Setup No specific setup is required other than to meet the preconditions of the transaction. ## Preconditions * The Inspection Plan exists in the system and is in Active or Created state. ## Sequence of Steps The Terminate Inspection Plan wizard can be called from the **Inspection Plan** page within the Business Data Group. There are several ways to terminate a versioned object. Depending on the level, follow these steps to get started: * Revision - If you want to terminate a revision, go to the **Terminate** dropdown button on the top ribbon and select **Revision**. For more information, see [Revisions](../../general/revisions/index.md). * Version - If you want to terminate a version associated to an existing revision, go to the **Terminate** dropdown button on the top ribbon and select **Version**. For more information, see [Versions](../../general/versions/index.md). ### Step 1: General Data 1. Select **Terminate** to perform the operation. All generic/smart table rows that reference the current object will be removed and will not be recovered if the object is unterminated at a later point. For more information, see [Terminate and Unterminate](../../general/terminate_and_unterminate.md). ![terminate_inspection_plan][terminate_inspection_plan] [terminate_inspection_plan]: images/terminate_inspection_plan.png