# System KPIs
Below you can see a list of all Dynamic KPIs available out of the box in Critical Manufacturing MES:
| KPI | Entity Type |Manual Calculation | Description | Dimension | KPI Type | Parameter |
| ------------------------------------------------- | -------------------------------------------- |------------------------ | -------------------------------------------------------------------------------------------------------------------------------------------------- | -------------------------------------------------------------------------------------------------------------------------- | --------- | -------------- |
| **Average Assist Time** | - Resource |:material-pencil-circle: | The average time between the start and end of Assist Events for the selected Resource. | - Current Day
- Current Shift
- Last 3 Days
- Last 7 Days
- Current Week
- Current Month
- Current Order | Minimum | KPI Hours |
| **Average Changeover Time** | - Resource |:material-pencil-circle: | The average Setup Time of complete Setup transitions for the selected Resource. | - Current Day
- Current Shift
- Last 3 Days
- Last 7 Days
- Current Week
- Current Month | Minimum | KPI Minutes |
| **Closed Protocol Duration by Type and Severity** | - Protocol Instance | | The duration of Protocol Instances having the System State Closed by Type and Severity. | - Current
- Current Day
- Current Week
- Current Month | Minimum | KPI Hours |
| **Closed Protocol Duration by Type** | - Protocol Instance | | The duration of Protocol Instances having the System State Closed by Type. | - Current Day
- Current Week
- Current Month | Minimum | KPI Long |
| **Closed Protocol Instances** | - Protocol Instance | | The Number of Protocol Instances in SystemState = Closed | - Current Day
- Current Week
- Current Month | Minimum | KPI Long |
| **Completed Production Orders** | - Facility
- Product Group | | The number of Completed Production Orders for the selected entity. | - Current Day
- Current Shift
- Last 3 Days
- Last 7 Days
- Current Week
- Current Month
- Current Order | Maximum | KPI Long |
| **Completed Quantity** | - Facility
- Product Group | | The Quantity Completed for the selected entity. | - Current Day
- Current Shift
- Last 3 Days
- Last 7 Days
- Current Week
- Current Month | Maximum | KPI Decimal |
| **Components Placed Per Hour** | - Resource |:material-pencil-circle: | The average number of components placed per hour registered on component placement Events for the selected Resource. | - Current Day
- Current Shift
- Last 3 Days
- Last 7 Days
- Current Week
- Current Month
- Current Order | Maximum | KPI Decimal |
| **Defective Units Count** | - Area
- Facility
- Resource | | The Material Primary Quantity Loss for the selected entity. | - Current Day
- Current Shift
- Last 3 Days
- Last 7 Days
- Current Week
- Current Month | Minimum | KPI Decimal |
| **Down Reason Count** | - Resource | | The Reasons for the changes to Universal State Unscheduled Down for the selected Resource. | - Current | Maximum | None |
| **Down Reason** | - Resource | | The Down Reason for the selected Resource with System State set as Down. | - Last 7 Days | Deviation | None |
| **Equipment Recipe** | - Resource | | The Recipe of the selected Resource. | - Current | Deviation | None |
| **Equipment State** | - Resource | | The Universal State of the selected Resource. | - Current
- Last 7 Days | Deviation | None |
| **Fault Count** | - Resource |:material-pencil-circle: | The number of Fault Events for the selected Resource. | - Current Day
- Current Shift
- Last 3 Days
- Last 7 Days
- Current Week
- Current Month
- Current Order | Minimum | KPI Decimal |
| **First Pass Yield** | - Resource |:material-pencil-circle: | The number of OK Units Inspected Events divided by the number of OK and NOK Units Inspected Events for the selected Resource. | - Current Day
- Current Shift
- Last 3 Days
- Last 7 Days
- Current Week
- Current Month | Maximum | KPI Decimal |
| **Job Remaining Time** | - Resource | | The remaining process time of the last tracked-in Material in the selected Resource. | - Current | Maximum | KPI Decimal |
| **Loss Reason Sum** | - Area | | The sum of the losses per Reason recorded in the selected Area. | - Last 7 Days | Minimum | KPI Decimal |
| **Material Completed Quantity** | - Material | | The Processed Quantity of the oldest tracked-in Material in the selected Resource. | - Current | Maximum | KPI Long |
| **Material Customer** | - Resource | | The Customer of the Production Order of the oldest tracked-in Material in the selected Resource. | - Current | Deviation | None |
| **Material Elapsed Time** | - Material | | The start processing date of the oldest Material tracked-in in the Resource. | - Current | Minimum | KPI DateTime |
| **Material Estimated Remaining Time** | - Material | | The time until the Planned End Date of the oldest tracked-in Material in the selected Resource. | - Current | Minimum | KPI DateTime |
| **Material Product Description** | - Resource | | The Product Description of the oldest tracked-in Material in the selected Resource. | - Current | Deviation | None |
| **Material Product** | - Resource | | The Product of the oldest tracked-in Material in the selected Resource. | - Current | Deviation | None |
| **Material Progress** | - Material | | The progress of the Material's Completed Quantity of the oldest tracked-in Material in the selected Resource. | - Current | Maximum | KPI Percentage |
| **Material Quantity** | - Material | | The Quantity to Process of the oldest tracked-in Material in the selected Resource. | - Current | Deviation | KPI Long |
| **Material Remaining Quantity** | - Material | | The remaining Quantity to Process the oldest tracked-in Material in the selected Resource. | - Current | Minimum | KPI |
| **Material Units Produced** | - Resource | | The number of Units Produced Events for the selected Resource. | - Current Order | - | KPI Decimal |
| **Medium Time Between Assists** | - Resource | | The average time between Assist Events for the selected Resource. | - Current Day
- Current Shift
- Last 3 Days
- Last 7 Days
- Current Week
- Current Month
- Current Order | Minimum | KPI Hours |
| **Missing Volume by Item** | - Plan | | The delta between the Planned Volume and the Actual Volume - the unfulfilled volume per Time Frame, per Item | - User Defined | - | KPI Decimal |
| **MTBF** | - Area
- Facility
- Resource | | The Mean Time Between Failures for the selected entity. | - Current Day
- Current Shift
- Last 3 Days
- Last 7 Days
- Current Week
- Current Month | Maximum | KPI Hours |
| **MTTR** | - Area
- Facility
- Resource | | The Mean Time To Repair for the selected entity. | - Current Day
- Current Shift
- Last 3 Days
- Last 7 Days
- Current Week
- Current Month | Minimum | KPI Hours |
| **OEE** | - Area
- Facility
- Resource | | The Overall Equipment Effectiveness for the selected entity. | - Current Day
- Current Shift
- Last 3 Days
- Last 7 Days
- Current Week
- Current Month | Maximum | KPI Percentage |
| **On Hold Quantity** | - Area
- Facility
- Step | | The total Quantity placed on Hold in the selected entity. | - Current Day
- Current Shift
- Last 3 Days
- Last 7 Days
- Current Week
- Current Month | Minimum | KPI Decimal |
| **On-Time Delivery (%)** | - Facility
- Product Group | | The percentage of Production Orders closed at least until their Due Date for the selected entity. | - Current Day
- Current Shift
- Last 3 Days
- Last 7 Days
- Current Week
- Current Month | Maximum | KPI Percentage |
| **On-Time MAOs** | - Area
- Facility | | The ratio of on time completed MAOs (before Late Due) for the selected entity. | - Current Day
- Current Shift
- Last 3 Days
- Last 7 Days
- Current Week
- Current Month | Maximum | KPI Percentage |
| **Open Protocol Instances by Type** | - Protocol Instance | | The Number of Protocol Instances having the System State Open by Type. | - Current | Minimum | KPI Long |
| **Open Protocol Instances** | - Protocol Instance | | The Number of Protocol Instances having the System State Open. | - Current | Minimum | KPI Long |
| **Pending Corrective MAOs** | - Area
- Facility | | The Pending Corrective MAOs for the selected entity. | - Total
- By State | Minimum | KPI Long |
| **Pending Late Production Orders** | - Facility
- Product Group | | The number of Pending Late Production Orders for the selected entity. | - Current | Minimum | KPI Long |
| **Pending Late Quantity** | - Facility
- Product Group | | The Pending Late Quantity for the selected entity. | - Current | Minimum | KPI Decimal |
| **Pending Preventive MAOs** | - Area
- Facility | | The Pending Preventive MAOs for the selected entity. | - Total
- By State | Minimum | KPI Long |
| **Performance Efficiency** | - Resource | | The Performance Efficiency percentage for the selected Resource. | - Current Day
- Current Shift
- Last 3 Days
- Last 7 Days
- Current Week
- Current Month | Maximum | KPI Percentage |
| **Placement Efficiency** | - Resource |:material-pencil-circle: | The number of placed components divided by the number of placed and misplaced components registered on component placement Events for the selected Resource. | - Current Day
- Current Shift
- Last 7 Days
- Current Week
- Current Month | Maximum | KPI Percentage |
| **Quality Affected Quantity Dataset** | - Area
- Facility
- Step | | A Dataset containing information about the Quantity put on Hold, sent to Rework, and/or Lost for the selected entity. | - Last 7 Days | Minimum | KPI Decimal |
| **Rate of Quality** | - Resource | | The Rate of Quality percentage for the selected Resource. | - Current Day
- Current Shift
- Last 3 Days
- Last 7 Days
- Current Week
- Current Month | Maximum | KPI Percentage |
| **Reject Rate** | - Resource |:material-pencil-circle: | The number of rejected components divided by the number of total components for the selected Resource. | - Current Day
- Current Shift
- Last 7 Days
- Current Week
- Current Month | Minimum | KPI Percentage |
| **Resources Down** | - Area | | The number of Resources with System State Down for the selected Area. | - Current | Minimum | KPI Decimal |
| **Resources Up** | - Area | | The number of Resources with System State Up for the selected Area. | - Current | Maximum | KPI Decimal |
| **State** | - Resource | | The Universal State for the selected Resource. | - Current
- Last 7 Days | - | None |
| **Throughput Rate** | - Plan | | The Produced Quantity per Unit Time, per Manufacturing Unit, connected to a Plan | - User Defined | - | KPI Decimal |
| **Top Products by Loss Quantity** | - Facility
- Product Group | | The Products with the highest Loss Quantities for the selected Product Group. | - Current Day Top 10
- Current Shift Top 10
- Current Week Top 10
- Current Month Top 10 | Minimum | KPI Decimal |
| **Top Reasons by Lost Quantity** | - Facility
- Product Group | | The Loss Reasons with the highest Lost Quantity for the selected Product Group. | - Current Day
- Current Shift
- Current Week
- Current Month | Minimum | KPI Decimal |
| **Top Reasons by Quantity on Hold** | - Facility
- Product Group | | The Hold Reasons with the highest Quantity on Hold for the selected Product Group. | - Current Day
- Current Shift
- Current Week
- Current Month | Minimum | KPI Decimal |
| **Top Resources with AdHoc Maintenance** | - Area
- Facility | | The Resources with the most requests for AdHoc Activities for the selected Facility. | - Current Day
- Current Shift
- Last 3 Days
- Last 7 Days
- Current Week
- Current Month | Minimum | KPI Long |
| **Unit Cycle Time** | - Resource | | The average processing time per unit for the selected Resource. | - Current Day
- Current Shift
- Last 3 Days
- Last 7 Days
- Current Week
- Current Month | Minimum | KPI Seconds |
| **Uptime %** | - Resource | | The Up Time percentage of the selected Resource. | - Current Day
- Current Shift
- Last 3 Days
- Last 7 Days
- Current Week
- Current Month | Maximum | KPI Percentage |
| **Volume Fulfilment** | - Plan | | The Percentage of the Total Planned Volume in the Plan that was achieved. | - User Defined | - | KPI Percentage |
| **Volume In** | - Resource
- Step | | The In Process Quantity registered for the selected entity. | - Current Shift
- Last 7 Days | Maximum | KPI Decimal |
| **Volume Out** | - Resource
- Step | | The Processed Quantity registered for the selected entity. | - Current Shift
- Last 7 Days | Maximum | KPI Decimal |
| **Yield** | - Area
- Facility
- Resource
- Step | | The Processed Quantity divided by the Processed Quantity plus the In Process and the Processed Quantity Losses registered for the selected entity. | - Current Day
- Current Shift
- Last 3 Days
- Last 7 Days
- Current Week
- Current Month | Maximum | KPI Percentage |
Table: Available Dynamic KPIs
In the above table, the KPIs marked with a :material-pencil-circle: need to be calculated by the user through the following steps:
1. Storing the necessary data in a database where the data will be accessed;
2. Creating a **DEE Action** to perform the required calculation on that data;
3. Attaching that **DEE Action** to a **Rule**;
4. Changing the Source Type of the KPI Dimensions to **Rule**, and associating the created **Rule**.
This leads to the data being displayed in dashboards with out-of-the-box KPIs not being ready to be used unless there are extra steps performed to allow applying the calculations to the retrieved values.