--- alias: user-guide-track-in-schedule-override description: "This documentation details how to manually track materials outside of scheduled sequences" --- # Track-In with Schedule Override :lock: Material.**TrackInOverride** ## Overview This operation allows you to perform a *Track-In* of a **Material** which is not the next **Material** in the **Resource** *Schedule* sequence. It also allows the user to *Track-In* the **Material** to another **Resource**. For more information, please refer to the [Track-In Material](track_in_material.md) wizard information.