--- alias: user-guide-adjust-plan-targets description: "Adjust Plan Targets allows modifying planned values within a plan scenario" --- # Adjust Plan Targets :lock: Plan.**Edit** ## Overview This operation is used to adjust the targets in the **Plan**. ## Setup No specific setup is required other than to meet the preconditions of the transaction. ## Preconditions * The **Plan** exists in the system and is Active. * The **Plan** is a **Plan Scenario** and not an Effective Plan. ## Sequence of Steps The Adjust Plan Targets operation can be called from the **Plan** page within the Business Data Group. Navigate to the Planning view and select the **Adjust Targets** button on the top ribbon. Much like the [Edit Plan Scenario](plan-scenario/edit_plan_scenario.md), adjusting the targets of a **Plan Scenario** places the current **Plan Scenario** in an editing mode, allowing you to perform changes to the planned values defined for each of the time frames available. Selecting any of the grid cells will show a small popup dialog where you can enter the new target value for that time frame. After editing the values, select **Save** on the top ribbon to complete the operation or **Cancel** to undo the changes. ![Screenshot showing a factory planning interface with adjustable plan targets.](images/adjust_plan_targets.png)