--- alias: user-guide-manage-resource-lanes description: "Manage Resource Lanes allows modification of lanes associated with a resource" --- # Manage Resource Lanes :lock: Resource.**Edit** ## Overview This operation is used to manage all the Resource Lanes associated to a specific **Resource**. ## Setup No setup is required other than to meet the preconditions of the transaction. ## Preconditions * The **Resource** exists, is Active and the Processing Type is Process or Line. * The **Resource** has the Is Multilane property enabled. ## Sequence of Steps ### Step 1 1. Select an appropriate **Resource**, navigate to the **Lanes** section and select the **Manage** button. 2. Add or remove Resource Lanes as needed (select :material-plus: to add, and :material-trash-can: to remove). 3. Order lanes as needed (select :material-arrow-up: and :material-arrow-down:). 4. You must specify at least two items, and provide for each item the following information: * Name. * Optionally, a description. 5. Select **Update** to complete the operation. ![Screenshot showing a system configuration dialog with AES 8 SNA settings, related to managing resource lanes.](images/manage_resource_lanes.png)