--- alias: user-guide-change-send-ahead-run-materials description: "This documentation details modifying Send-Ahead Run material states between Waiting and Send-Ahead" --- # Change Send-Ahead Run Materials :lock: SendAheadRun.**Edit** ## Overview This operation is used to change **Materials** associated to the **Send-Ahead Run** from Waiting to Send-Ahead and vice-versa. ## Setup No specific setup is required other than to meet the preconditions of the transaction. ## Preconditions * The **Send-Ahead Run** exists in the system, the System State is Active and the state is Open. * To change a Waiting **Material** to a Send-Ahead **Material**: * The send-ahead **Material** must be at or before the **Send-Ahead Run** Evaluate **Step** and it must be possible to reach the Wait **Step**, the Evaluate **Step** and if defined, the Merge **Step**. * To change a send-ahead **Material** to a Waiting **Material**, the **Material**: * The send-ahead **Material** cannot have the result set to `Pass`. * The send-ahead **Material** must be at or before the **Send-Ahead Run** Wait **Step** and it must be possible to reach the Evaluate **Step** and if defined, the Merge **Step**. ## Sequence of Steps The Change Send-Ahead Run Material wizard can be called from the **Send-Ahead Run** page within the Business Data Group. !!! info For this operation to be called directly from the **Send-Ahead Run** page, the Capture Results Mode must be set to Manual. ### Waiting Materials to Send-Ahead Materials 1. Selecting a **Send-Ahead Run** that matches the preconditions, navigate to the **Materials** section and within that section open the Waiting Materials tab. 2. Select a waiting **Material** by ticking the appropriate row. 3. Select the **Change** button on top of the grid to open the wizard. 4. Review the information Select **Change** to complete the operation. ![Screenshot showing a UI with options related to sending ahead materials in a process of changing materials.](images/change_materials_to_send_ahead.png) ### Send-Ahead Materials to Waiting Materials 1. Selecting a **Send-Ahead Run** that matches the preconditions, navigate to the **Materials** section and within that section open the Send-Ahead Materials tab. 2. Select a send-ahead **Material** by ticking the appropriate row. 3. Select the **Change** button on top of the grid to open the wizard. 4. Review the information Select **Change** to complete the operation. ![Screenshot showing a UI with "Change" button highlighted, as part of completing the operation.](images/change_materials_to_waiting.png)