--- alias: user-guide-create-inspection-plan description: "Create an Inspection Plan to define and manage inspection processes, ensuring quality control" --- # Create Inspection Plan :lock: InspectionPlan.**Create** :lock: InspectionPlan.**CreateTemplate** :lock: InspectionPlan.**CreateFromTemplate** ## Overview This operation is used to create an **Inspection Plan**. ## Preconditions The **Inspection Plan** name must be provided and unique. ## Sequence of Steps There are several ways to create a new versioned object. Depending on the level, follow these steps to get started: * Entity - In the landing page of this entity type in the Business Data menu or in the details page of an existing entity of the same type, select **New** on the top ribbon. For more information see [Creating Entity Objects](../../general/creating_entity_objects.md). * Revision - If you want to create a new revision, go to the **New** dropdown button on the top ribbon and select **Revision**. For more information, see [Revisions](../../general/revisions/index.md). * Version - If you want to create a version associated to an existing revision, go to the **New** dropdown button on the top ribbon and select **Version**. For more information, see [Versions](../../general/versions/index.md). ### Step 1: Change Set 1. Select an existing Change Set or select Create to create a new **Change Set**. If configured to support implicit **Change Sets**, it is also possible to check the option Use Automatic Change Set. 2. Optionally, select an Approval Role. ### Step 2: General Data 1. Provide a unique name for the **Inspection Plan**. 2. If you are creating a new version, the revision that was selected when you started the process will be the revision this version will be associated with. If you are creating a new entity or revision (with a new version associated to it), provide a name for the revision or it will be automatically generated for you. For more information on revision naming, see [Revision Naming](../../../general/revisions#Naming/). 3. Optionally, provide a description of the **Inspection Plan**. 4. Select the **Inspection Plan** type. The list of possible values is taken from the [[inspectionplantype-lt | Inspection Plan Type Lookup Table ]]. 5. Select which options you would like to enable in the **Default Inspection** section: * Results Required Before Track-Out - controls whether the **Inspection Order** must be Closed, with all results captured, before you can Track-Out the main **Material**. This option only controls whether results must be finalized: an incomplete Inspection Order Step Sample blocks a full Track-Out of the main **Material** even when this flag is not selected. * Enable Multiple Samples - the **Inspection Plan** can have multiple samples to inspect. * Contains Separate Inspection Steps - the **Inspection Plan** can contain separate Inspection Steps. !!! note The Inspection Plan can only contain more than one Inspection Plan Step if the `Contains Separate Inspection Steps` flag is selected. 6. In the **Inspection Settings** section: * The **Close Automatically on Pass** flag closes the **Inspection Plan** automatically when the inspection result is `Pass`. * The **Close Automatically on Fail** option closes the **Inspection Plan** automatically when the inspection result is `Fail`. * Enable the automatic opening of a **Protocol** to address a `Fail` result. If enabled, select the appropriate **Protocol** to be opened. * Configure a Future Hold on the **Material** by selecting its creation mode: * `None`- no Future Hold will be created. * `Always` - when the **Inspection Plan** is assigned to a **Step**. * `On Fail` - when the **Inspection Plan** fails. ??? note "Future Hold Information section (only appears if Future Hold Creation Mode is Always or On Fail)" Select the Future Hold **Step** and **Reason**. Optionally, the following properties can also be defined: * Future Hold Release Role * Future Hold Release Code * Future Hold Comment * Future Hold Distribution List ![Screenshot showing the Create Inspection Plan wizard, in the general data tab, in the future hold information section ](images/create_inspection_plan_step_one_future_hold_information.png) * Choose whether to immediately put the **Material** on Hold when the **Inspection Plan** fails. ??? note "Hold Information section (only appears if the Material set on Hold when the Inspection Plan fails)" Select the Hold **Reason**. Optionally, the following properties can also be defined: * Hold Release Role * Hold Release Code * Hold Comment ![Screenshot showing the Create Inspection Plan wizard, in the general data tab, in the hold information section ](images/create_inspection_plan_step_one_hold_information.png) 7. Select **Next** to define the **Inspection Plan** Steps. ![Screenshot showing the Create Inspection Plan wizard in the general data tab. ](images/create_inspection_plan_step_one.png) ### Step 3: Steps This section is used to define the different steps for the **Inspection Plan**. 1. Add as many **Inspection Plan** **Steps** as desired (select :material-plus: in the top right of the grid to add, :material-trash-can: to remove, and order the **Steps** with the :material-arrow-up: and :material-arrow-down: buttons, or by dragging them). The steps can also be copied from other steps that belong to an existing version of the same **Inspection Plan**, by using the Copy Steps option. 2. Specify at least one **Step**, and provide the following information for each: * Enable `Is in Process Inspection` if the Inspection takes place at the same Step where the Inspection Plan is triggered. This removes the need for any other Inspection Plan Step configuration. * If the `Is in Process Inspection` is not enabled, specify the following information: * The Inspection **Flow** and **Step** where the **Inspection Plan** will be performed. * The Split Type to be performed: * None - No Split. * Permanent - The **Material** will be Split and transformed into several Child Materials. * Temporary - The **Materials** created during the Inspection Plan Step shall be merged back with the original Material at the end of the **Flow**. ??? note "Split Information section (only appears if a Split is to be performed)" Select the Split Mode: * Inspection Step - select one of the Inspection Plan Steps to be used as a Split **Step**. * Process Step - the Split will be performed in the same **Step**. Choose the **Step** in which the Split will be performed. ![Screenshot showing the Create Inspection Plan wizard, in the Steps tab, in the split information section ](images/create_inspection_plan_step_two_split_information.png) * Choose whether to scrap the **Material** sample used for the inspection. If set as `true`, select the appropriate **Reason** for the scrap. !!! warning If the **Inspection Plan** contains an In-Process Inspection **Step** and the Results Required Before Track Out property is set to `true`, both the Close Automatically on Pass and Close Automatically on Fail properties must be set to `true`. 3. Select **Create** to complete the operation and the new **Inspection Plan** will be created. ![Screenshot showing the Create Inspection Plan wizard in the steps tab.](images/create_inspection_plan_step_two.png)