E58Nonscheduled#
Description: E58Nonscheduled
The E58Nonscheduled table has the following values inserted in a fresh installation of the Critical Manufacturing MES:
| Name | Value | Description | Comments |
|---|---|---|---|
| NST | NST | 6000 | |
| NST/Unworked shifts | NST/Unworked shifts | 6100 | |
| NST/Equipment installation | NST/Equipment installation | 6200 | |
| NST/Equipment modifications | NST/Equipment modifications | 6300 | |
| NST/Off-line training | NST/Off-line training | 6400 | |
| NST/Shutdown and startup | NST/Shutdown and startup | 6500 |
Table: E58Nonscheduled values