--- alias: user-guide-unterminate-inspection-plan description: "This documentation details the process of removing an inspection plan from the system" --- # Unterminate Inspection Plan :lock: InspectionPlan.**Unterminate** ## Overview This operation is used to Unterminate a Inspection Plan. ## Setup No specific setup is required other than to meet the preconditions of the transaction. ## Preconditions * The **Inspection Plan** exists in the system and is in the Terminated state. ## Sequence of Steps The Unterminate Inspection Plan wizard can be called from the **Inspection Plan** page within the Business Data Group. ### Step 1: Change Set 1. Select an existing Change Set or select Create to create a new **Change Set**. If configured to support implicit **Change Sets**, it is also possible to check the option Use Automatic Change Set. 2. Optionally, select an Approval Role. ### Step 2: Details 1. Select **Unterminate** to perform the operation. All generic/smart table rows that reference this object will not be recovered. For more information, see [Terminate and Unterminate](../../general/terminate_and_unterminate.md). ![unterminate_inspection_plan][unterminate_inspection_plan] [unterminate_inspection_plan]: images/unterminate_inspection_plan.png