Compose New Material for Qualification#
MaintenanceActivityOrder.ComposeNewMaterialForQualification
Overview#
This operation is used to Compose a New Material to be assigned to the Qualification of a Maintenance Activity Order (MAO).
Preconditions#
- The MAO exists and is Active.
- The MAO Maintenance Type is set to Qualification.
- The MAO Material Type Restriction Mode is set to Require Specific.
- The MAO Execution State is Requested, Approved, Released, In Progress, or Waiting For Acceptance.
- There must be at least one MAO Qualification Check whose system state is neither Completed or Obsolete.
- The Material exists, is Active, and Non-Template.
- The Material is Top-Most and not in an Off-Flow (either Temporary Off-Flow or Rework).
- The Material Pick List Item Count must be empty.
- The Material In Transfer Order Item must be empty.
- If the Material is associated with a Resource, and the state of the Material is Consumable, Durable, Dispatched, In Process, or the property In Store is set to
true, the Resource Inventory Locked must befalse. - The Material Is Approved property must not be set to
false. - The Material Expiration Date is
null, or if defined, it must be in the future. - The Source Material Floor Life must be valid. This condition is met if any of the following applies:
- Floor Life Remaining Hours is
null; or - Floor Life Remaining Hours is greater than
0and the Floor Life Counter State is Stopped; or - The Floor Life Counter State is Running, and the Floor Life Remaining Hours - calculated as
Floor Life Remaining Hours - (Now() - Floor Life Open Date)- is greater than0.
- Floor Life Remaining Hours is
- The Material Product must not be blocked or if blocked, the Material property Override Product Block must be
true. - The MAO Assignment Compose Map BOM is defined and the Product of the chosen Sub-Material at position 1 must match the Product of the BOM Product in the same position.
Sequence of Steps#
Step 1: General Data#
- Select a MAO that matches the preconditions above.
- Select the Compose New Material button on the top ribbon.
-
In the Compose New Material for Qualification wizard, provide the following information:
- Name – unique identifier of the Material. May be automatically generated if a name generator is configured.
- Description – optional free-text description providing additional context for the Material.
- State Model – lifecycle model that defines the allowed states and transitions of the Material.
- State – initial state of the Material within the selected state model.
- Facility – Facility to which the Material is assigned.
- Form – physical or logical form of the Material, selected from the MaterialForm Lookup Table.
- Flow and Step – production Flow and Step associated with the Material, used for routing and processing.
- Primary Quantity – main quantity of the Material, expressed in the primary unit of measure.
- Expiration Date – date after which the Material can no longer be used as a consumable.
- Manufacturer – name of the Material manufacturer.
- Supplier – supplier from which the Material was procured.
- Manufacturer Part Number – manufacturer-defined part number associated with the Material.
- Manufacturer Lot Number – manufacturer lot or batch identifier.
- Manufacturer Date Code – date code provided by the manufacturer, typically indicating the production date.
- Purchase Order Number – purchase order reference associated with the Material.
- RoHS Compliant – indicates whether the Material complies with the restriction of hazardous substances (RoHS) directive.
- Moisture Sensitivity Level – classification of the Material sensitivity to moisture exposure.
- Floor Life Remaining Hours – remaining usable floor life of the Material, expressed in hours.
- Priority – scheduling priority of the Material, from 1 (lowest) to 10 (highest).
- Splits Allowed – indicates whether the Material can be split into multiple materials.
- Merges Allowed – indicates whether the Material can be merged with other materials.
- Hot – identifies the Material as a hot lot, giving it highest priority in dispatching and scheduling.
- Exclude From Scheduling – indicates whether the Material is excluded from scheduling operations.
- Production Order – production order associated with the Material.
- Order Nr – free-text order reference for external or customer-specific tracking.
- Possible Start Date – earliest date on which the Material can be considered for scheduling.
- Due Date – target completion date for the Material, used for scheduling purposes.
- Target Material Quantity – planned target quantity for the Material. Must be greater than zero.
- Target Material Units – unit of measure associated with the target material quantity.
- Capacity Class – capacity classification of the Material, using the values on the CapacityClass Lookup Table.
Recommended Reading
For more information about these properties, see Create Material.
-
Optionally, enter a comment.
- Select Next to continue.
Step 2: Compose Information#
- Select the Compose BOM Mode: Full or Partial.
- Select the Target Container.
-
Select the Materials' Form.
Recommended Reading
For more information about these properties and their associated preconditions, see Compose Material (Sub-Materials).
-
Enable or disable the Assign to Qualification flag. This option is available only when the Compose BOM Mode is set to Full and is enabled by default.
- Select Next to proceed.
Step 3: Source Materials#
- Add as many Source Materials as needed by selecting the icon. Only Source Materials with a compatible form for the selected Sub-Materials Form will be shown (based on the MaterialFormRelation Generic Table). You can also remove Materials by selecting the icon and filter Materials by selecting the icon.
- Select Next to continue.
Step 4: Sub-Materials Transfer#
- Add each Sub-Material in a designated position within the Container, as determined by the BOM Items Products. For highlighted positions in the Target Container, select compatible Materials based on the BOM-defined Products.
- Select Create to complete the operation.



