Special Insert Material into Line#
Material.InsertIntoLine
Overview#
This operation is used to insert a Material into a parent Material that is tracked-in (in process) at a Line, allowing the user to select the specific Line Step where the Material will be inserted. As a naming convention, the Material to be inserted is called Child Material and the Material where the Material will be inserted is called Parent Material.
Setup#
No special setup is required other than to meet the preconditions of the transaction.
Preconditions#
-
Both the Parent Material and Child Material:
- Are TopMost, Active and Non-Template
- Are not on Hold or Stored
- Do not have a FutureAction set
- Are not a part of a Pick List or a Transfer Order
- Must be in a Line Step
- The TargetQuantity must be null
- Have the same Facility, Step, Flow, Flow Path
- Have the same PrimaryUnits and SecondaryUnits
-
Regarding the Child Material:
- It's in state Queued
- It's Dispatchable
- If the PendingReworkReturn property is true, the Child Material can only be inserted via Special Insert Material Into Line and it must be inserted into the LineReworkStep in a Material that has the same LineReworkReturnFlowVersion. Note by design at this time, the Resource is not being enforced.
Note
Because this is a more restricted and lightweight operation, there are some checks that are not performed by design (e.g.: certifications, maintenance, product blocks, time-constraints, material dependencies).
- Regarding the Parent Material:
- It's in state InProcess
- If the Parent Material has an Experiment, the Child Material must have the same Experiment property defined.
- Regarding the Resource current processing the Parent Material:
- Must be TopMost and of processing type Line
- Must be Active and Non-Template
- Must have the System State Up
- The Inventory Locked must be false
- The Resource Enable SubTrackin property must be true
- If the Child Material RequiredResource is set, the Parent Material Resource must be equal to that Required Resource
- Regarding the destination Flow Path where the Child Material will be inserted:
- In the Parent Material structure Material Line Steps, there must be a valid active Material Line Step with a reference to that Flow Path
- The relationship Parent Material Form to Child Material Form must be defined in the MaterialForm table
Sequence of Steps#
Step 1#
- Select a Child Material matching the pre-conditions outlined above. Select Insert Material Into Line from the top ribbon.
- Select a Resource matching the pre-conditions outlined above.
- Select a Parent Material currently in state InProcess at the Resource where the Child Material will be inserted.
-
Select in which Line Step to insert the ChildMaterial.
Info
If the
PendingLineReworkReturnproperty is not set, the default value is the one withIsFirstStepset totrue. In alternative, ifPendingLineReworkReturnistrue, the default is the value of theLineReworkReturnFlowPathproperty if it is set; otherwise, the default is theLineReworkReturnStep. -
Review the information and select Insert to complete the transaction.
Info
For more information, see the Line Material Tracking tutorial.