--- alias: user-guide-synchronize-material-substrate-map description: "This documentation details synchronizing a material with its substrate map data" --- # Synchronize Material with Substrate Map :lock: Material.**SynchronizeWithSubstrateMap** ## Overview This operation is used to synchronize a **Material** with its **Substrate Map**. ## Setup No special setup is required other than to meet the preconditions of the transaction. ## Preconditions * The **Material** must be Active and Non-Template. * The **Material** has a **Substrate Map**. ## Sequence of Steps The **Synchronize With Substrate Map** wizard is called from the Details page of the selected **Material**. Depending on the current system status, the **Synchronize With Substrate Map** button may be visible on the top ribbon or under the **More** actions button. ### Step 1: General Data 1. Select the **Material** you need. 2. Under **Mapping**, select **Synchronize With Substrate Map** to open the wizard. 3. If the **Material** synchronization properties Layout Specifier, Overlay, Units are not set, you must specify them. If they are set, you can override them, and the following may apply: * If more than one Layout Specifier exists for the provided Substrate in the collection of **Substrate Maps** for the current **Material** as Substrate Id of the selected Substrate Map Payload, you must specify which Layout Specifier to use. * If for the specified Layout Specifier (or the single Layout Specifier if there is only one), there are more than one possible Overlay Maps, you must specify the Overlay Map to use by providing the Map Name. * If the **Substrate Map** has an Active Bin Code Map, the system will pre-select the Active Bin Code Map Layout Specifier and the Overlay Map. For more information, see [[user-guide-create-substrate-map-overlay]]. * If the **Material** has Secondary Units, you must specify which Substrate Map Units to synchronize: the Primary Units or Secondary Units – always by name of the units. 4. The GUI should present the quantity of units that exist in the Map as well as the delta to the Material Quantity matching units to synchronize. 5. Verify the information to synchronize. 6. Optionally, specify a Loss/Bonus Reason to account for negative/positive delta(s). 7. Optionally, enter a comment. 8. Select **Synchronize** to complete the operation. ![Screenshot showing a substrate map with synchronization settings.](images/substrate_map_synchronize.png) !!! warning This operation will not convert bins if a Bin Converter exists for the Substrate Map. If any Pass bins are generated from the conversion, they will be excluded when determining the quantity to assign to the Material.