Terminate Package#
Package.Terminate
Overview#
This operation is used to Terminate a Package.
Setup#
No specific setup is required other than to meet the preconditions of the transaction.
Preconditions#
- The Package exists in the system and is Active or Created.
- In case an empty Package exists and must be terminated. The system must ensure the following:
- The Package is not contained in another Package - the Parent Package is empty.
- If Package Content Type is Package:
- The Package is either empty (Sub-Package Count greater than zero) or in its hierarchy (only for Active Packages) it only contains a Single Material.
- If Package Content Type is different from Package:
- The Package Packed Quantity Units must match the current Material Primary Units.
- If the Material has a Current BOM associated of type Packing:
- The Package Packed Quantity Units must match the Material Current BOM Units.
- The Package Total Packed Quantity must be less than or equal to the Material Assembled Quantity.
Sequence of Steps#
The Terminate Package wizard can be called from the Package page within the Business Data Group.
Step 1: General Data#
- In the More button on the top ribbon, select Terminate to perform the operation. All generic/smart table rows that reference the current object will be removed and will not be recovered if the object is unterminated at a later point.
-
If the Package Content Type is different from Package or equal to Package, and Sub-Package Count is greater than zero:
- You must provide a valid Loss Reason applicable to Terminate that is associated to the current Package Material Step.
- If the Step defines Loss Classifications, you must supply the Loss Classifications.
- You can specify that the Material should be terminated if it has no Sub-Materials and Primary and Secondary Quantity reach zero.
Info
For more information, see Terminate and Unterminate.
