--- alias: user-guide-manage-plan-excluded-material-types tags: - scheduling description: "Manage excluded material types within a plan to adjust volume calculations" --- # Manage Plan Excluded Material Types :lock: Plan.**Edit** ## Overview This operation is used to manage the **Material** types that are not to be considered in the actual volume count for the **Plan**. ## Setup No specific setup is required other than to meet the preconditions of the transaction. ## Preconditions * The **Plan** exists in the system and is Active. * The **Plan** is an Effective Plan and is not a **Plan Scenario**. ## Sequence of Steps The Manage Plan Excluded Material Types operation can be called from the **Plan** page within the Business Data Group, scrolling to the Excluded Material Types section in the main **Plan** page. In the wizard: 1. Select all **Material** types that should be excluded from volume calculations. Add as many **Material** types as desired (press :material-plus: to add and :material-trash-can: to remove), specifying for each item the **Material** type. 2. Press **Update** to complete the transaction. ![Screenshot showing a management plan for excluded material types, with options to view details.](images/manage_plan_excluded_material_types.png)