Begin Line Setup#
Resource.BeginLineSetup
Overview#
This operation is used to mark the Sub-Resource(s) of a Line Resource as being in setup, indicating that the user is beginning setup for a Material on a given Resource.
Setup#
No special setup is required other than to meet the preconditions of the transaction.
Preconditions#
- The main Resource is of processing type Line.
- The Resource property In Setup must be
false. - The Resource Setup Mode must be Always or Changeover.
- The Setup Characteristic property of the Step must be set.
- A Material must be selected.
- The Sub-Resource property Setup Begin and Complete Mode must be Manual Begin and Complete.
- If there are Material Line Step Resources that match the setup Material, Resource, and Step, their Setup State must be Not Started.
Sequence of Steps#
Step 1: General Data#
- Select a Resource matching the preconditions.
- Go to the Resource View and select a Material.
-
Select the Begin Line Setup button on the top ribbon to open the wizard:
-
The Begin Line Setup (Sub-Resources) wizard will display the Sub-Resources that are available to begin the line setup for the given Material:
-
Select one or more Resources to start the setup.
- The system will suggest a default transition, and if applicable, also a Reason, which you will be able to override.
- Optionally, enter a comment.
- Select Begin to complete the operation.

