--- alias: user-guide-manage-resource-dispatch-queue description: "Manage the order of materials within a resource’s processing queue" --- # Manage Dispatch Queue :lock: Resource.**ManageDispatchQueue** ## Overview This operation is used to manage the Resource's queue, i.e, the **Material** processing order. ## Setup No special setup is required other than to meet the preconditions of the transaction. ## Preconditions * The **Resource** is Active in the system. ## Sequence of Steps ### Step 1 1. When the wizard is open, select the directional arrows on the top right-hand side of the grid's toolbar to choose the position of the **Material**. Alternatively, it is possible to drag a **Material** and drop it in the desired order. 2. If you want to revert the order of the **Material**, select the Reset button to reset the sorting. 3. If the Resource has Lanes (Lane Count > 0), you must select which Lane you want to manage the order of (order will be per Lane in that case). ![Screenshot showing a resource management interface with lane selection options.](images/manage_queue_lanes.png) 4. Verify the **Material** information that is displayed on the right-hand side of the screen. 5. Optionally, enter a Comment. 6. Select **Update** to complete the operation. ![Screenshot showing a dispatch queue management interface with various options and labels.](images/manage_queue.png)