--- alias: user-guide-create-split-send-ahead-run description: "This documentation outlines splitting existing materials into send-ahead sub-materials within a run" --- # Create Split Send-Ahead Run :lock: SendAheadRun.**Edit** ## Overview This operation is used to split any Waiting **Materials** associated to a **Send-Ahead Run** and add the **Sub-Materials** as send-ahead **Materials**. ## Setup No specific setup is required other than to meet the precondition of the transaction. ## Preconditions * **Materials** must be Waiting **Materials** in a **Send-Ahead Run**. ## Sequence of Steps The Record Send-Ahead Run Result wizard can be called from the **Send-Ahead Run** page within the Business Data Group. ### Step 1: Waiting Materials !!! info For this operation to be called directly from the **Send-Ahead Run** page, the Capture Results Mode must be set to Manual. 1. Selecting a **Send-Ahead Run** that matches the preconditions, navigate to the **Materials** section and within that section open the Send-Ahead Materials tab. 2. Select a waiting **Material** by ticking the appropriate row. 3. Select the **Create Split** button on top of the grid to open the wizard. 4. Define the Split Type for the send-ahead scenario: * None * Logical * Physical 5. If the Split is defined as Logical or Physical, define the Split Scope. There are two options: * Temporary * Permanent 6. If the Split is defined as Logical or Physical, optionally define the default **Container** for the **Sub-Materials**. 7. Select **Next** to continue to the next section ### Step 2: Sub-Materials to Send-Ahead 1. Select which of the **Sub-Materials** to be included in the **Send-Ahead Run**. At least one **Sub-Material** must be selected. After you select the **Sub-Materials**, select **Next** to continue to the next section. 2. Select **Create** to complete the operation. ![Screenshot showing a UI with "Create" button selected, related to sending sub-materials for a project called "Gooste Sp Send Awad".](images/create_split_send_ahead.png)