--- alias: user-guide-manage-send-ahead-run-materials description: "Manage Send-Ahead Run materials by configuring and adding specific material components within the workflow" --- # Manage Send-Ahead Run Materials :lock: SendAheadRun.**Edit** ## Overview This operation is used to manage the **Materials** associated to a **Send-Ahead Run**. ## Setup No specific setup is required other than to meet the precondition of the transaction. ## Preconditions * All **Materials** in the **Send-Ahead Run** **Materials** must be TopMost, Active and non-Template. * Every **Material** in the **Send-Ahead Run** **Materials** must be unique within the **Send-Ahead Run**. ## Sequence of Steps Selecting a **Send-Ahead Run** that matches the preconditions, select **Manage** from the top ribbon. ### Step 1: Waiting Materials 1. Add as many rows as desired (each row represents a new **Material** to be added to the **Send-Ahead Run** as a Waiting **Material**) by pressing :material-plus: in the top right of the grid and pressing :material-trash-can: to remove any added entry. !!! info The **Material** must be at or before the Send-Ahead Run Wait **Step** and it must be possible to reach the Evaluate **Step** and if defined, the Merge **Step**. 2. General data will be displayed on the **Material** for which the **Send-Ahead Run** will be created. If the **Material** has **Sub-Materials**, you can also define some additional configurations: * Define the Split Type for the send-ahead scenario: * None * Logical * Physical * If the Split is defined as Logical or Physical, define the Split Scope. There are two options: * Temporary * Permanent * If the Split is defined as Logical or Physical, optionally define the default **Container** for the **Sub-Materials**. 3. Select **Next** to continue to the next section. ### Step 2: Sub-Materials to Send-Ahead !!! info This step will only be displayed if any type of Split other than `None` was selected in the previous step and if the Materials don't have the Result set. Select which of the **Sub-Materials** to be included in the **Send-Ahead Run**. At least one **Sub-Material** must be selected. After you select the **Sub-Materials**, select **Next** to continue to the next section. ### Step 3: Send-Ahead Materials 1. Add as many rows as desired (each row represents a new **Material** to be added to the **Send-Ahead Run** as a send-ahead **Material**) by pressing :material-plus: in the top right of the grid and pressing :material-trash-can: to remove any added entry. !!! info The **Material** must be at or before the Send-Ahead Run Wait **Step** and it must be possible to reach the Wait **Step**, the Evaluate **Step** and if defined, the Merge **Step**. 2. Information will be displayed for each of the **Sub-Materials** that will be included in the **Send-Ahead Run**. 3. Select **Update** to complete the operation. ![Screenshot showing a UI for managing send-ahead run materials, with fields including "Manage Send Ahead Run Materials" and "Update".](images/manage_send_ahead_run_materials.png)