This functionality enables the use of TraceabilityData Event from OIB Traceability Extension to collect Process Lense Inspection data in MES.

How To configure#

Relevant Artifacts#

The table below describes the properties for this entity type:

Name Type Is Mandatory Data Type Description
IoTMetadataDefinition SmartTable Yes Metadata configuration for equipment integration
CreateDefects Service Yes Template Service to handle Material Defect creation

To enable TraceabilityData material Inspection functionality we need to configure the extension and any other relevant key as described below:

IoTMetadataDefinition Area Level Configuration#

Set the following keys at the Area level:

Name Type Possible Values Default Value Description
oib_Traceability_disabled String true
false
true This will enable or disable the extension.
oib_Traceability_enablemode String None
OnePerEnterprise
OnePerSite
OnePerLine
None How should activate Traceability instance:
None - No instance will be used
OnePerEnterprise - One Instance for all Lines (Enterprise level)
OnePerSite - One Instance for all Lines (Site level)
OnePerLine - One Instance per Line
oib_Traceability_subscriptionnamesuffix String "" Will be added to the subscription name.
oib_Traceability_operationmode String Interlocking, Notification or Both Interlocking How we will interact with the system.
Example
Resource ResourceType Area Name Value
SMT_Production Line oib_Traceability_disabled false
SMT_Production Line oib_Traceability_enablemode OnePerLine
SMT_Production Line OIB_LineNameStationName_Line - TQ & TX2 & SX2_TX2 SMT_Pick_Place_1

Replace with the appropriate values depending on your setup.

IoTMetadataDefinition Resource Level Configuration#

  • useOIBToTrackIn: If set with TraceabilityData, this event will automatically track in the Material at the MES Resource.

    • UseTrackInOperation: Sets the Track In MES operation. Can be defined as ComplexDispatchAndTrackIn or ComplexTrackIn. Defaults to ComplexTrackIn if not defined.
    • useWaitForPreviousTrackout: Sets a wait time for the previous Track Out event to finish.
    • useWaitIfRecipeIsBeingChanged: Sets a wait time for the recipe change to finish on the current Resource.
    • DoPreviousTrackOut: If defined with any value, the controller logic will attempt to Track Out the previous Material tracked in the Resource before proceeding with the Track In operation for the current Material.
  • useOIBToTrackOut: If set with TraceabilityData, this event will automatically track out the Material at the MES Resource.

    • UseTrackOutOperation: Sets the Track Out MES operation. Can be defined as ComplexTrackOutAndMoveNext or ComplexTrackOut. Defaults to ComplexTrackOut if not defined.
    • waitForTraceToDoTrackOut: Sets a wait time for the Traceability data processing before Tracking Out.
    • waitForTrackInToDoTrackOut: Sets a wait time for the Track In operation to conclude before Tracking Out.
  • useOIBProcessLensTraceData: Toggle the processing of Process Lense data.

  • useInspectionToMaterialDefects: Toggle the use of Process Lense data to create material defects.
  • usePanelPositionToMaterialDefects: Toggle the use of Panel positions to identify the sub-material to whom we will associate the defect with. If true, it is assumed that the Material is a Parent and we will get the Sub Material using the position.
Example
Resource ResourceType Area Name Value
SMT_Pick_Place_1 useOIBToTrackIn TraceabilityData
SMT_Pick_Place_1 useOIBToTrackOut TraceabilityData
SMT_Pick_Place_1 useOIBProcessLensTraceData True
SMT_Pick_Place_1 useInspectionToMaterialDefects True

How To Use#

Traceability informs MES what where the Lense findings during the inspection process at the Station.

Implementation Details#

During Equipment Setup, and according to the defined operation mode, a new endpoint, subscription or both will be created/registered in OIB Central Server. This registration becomes the connection to MES where the Events or Requests will be sent by the configured Stations.

Station TraceabilityData Received:

  1. Resolves IoTMetadataDefinition for what tracking operations are configured.
  2. Check if any Track In/Out Conditions are enabled.
  3. Track In enabled:

    • Try to Track in Material received into the MES Resource.
  4. Inspection Processing.

    • If useOIBProcessLensTraceData is set to True we will:
      • If useInspectionToMaterialDefects is set to True, process the received data and use it to create MES Material Defects.
      • If useInspectionToMaterialDefects is set to False or unset, we will process the data and do a PassFail data collection according to the Lense and Operator Inspection Results.
  5. Track Out enabled:

    • Try to Track out Material received out of the MES Resource.